OxBox WM Instruction Sheet 7-17 1 Color - Sioux Chief

Squeeze and bend clip slightly to hold the stud. If going between studs, slide bracket into top track. Apriete y doble la abrazadera levemente para fijar el perno.
2MB Größe 5 Downloads 0 vistas
Patent Pending

Ice Maker Outlet Box

Ox Box



#IS-696-2 WASHING MACHINE OX BOX - 3/06 v1

Male CPVC

PEX Crimp

PEX F2080

ProPEX®

© 2006 SIOUX CHIEF MFG.

Kitec PEX

plain valve

valve with arrester

½" Nominal Shank Connections Available

• Durable

mount securely to stud ABS stands up to job site abuse • Available with Mini-Rester water hammer arrester • High-quality, North American quarter-turn ball valve

• Boxes

MIP/FSWT

Also Available

Ox Box

drain box

ORDER FRAMES SEPARATELY

18" bracket

supply box

dual frame

18" bracket

plain valves

supply box

box clip

box clip drain box

Standard Pack

Rough-in Pack

valves with arresters

Valve Options

Installation Instructions

Patent Pending

Washing Machine Outlet Box



S

D D

Plumb the drain line in the typical manner. Wait for glue to cure before testing.

OX BOX INSTALLATION INSTRUCTIONS - WASHING MACHINE OUTLET BOX

Plumb the supply lines in the typical manner. Open valves before soldering.

DO NOT allow flame to come into contact with the box.

DO NOT glue box. Apply glue to pipe only.

Straddle stud installations allow for the drain and vent pipe to easily be installed in same stud bay.

5

4

D

Gently bend boxes together. This will Secure with nails/screws in the middle allow the boxes to hold onto the stud. of the box clip and the top nailways.

Floating

S

Clip boxes together in desired configuration. Clip slides into tracks.

3

Separate Studs

S

2

Side Stud

S

1

Straddle Stud Installation

Straddle Stud (strongest installation)

Determine Placement of Boxes

D

Determine Configuration of Boxes

MIP/FSWT

Remove the test cap by clamping and twisting off the test nipple.

Remove Test Cap

To separate boxes, slide a thin, hard material (pocket knife) between the box and clip.

To Separate Boxes

Screw boxes to bracket (screw through bracket first).

Between Studs

Male CPVC

PEX Crimp

PEX F2080

SIOUX CHIEF MANUFACTURING COMPANY, INC.

ProPEX®

Kitec PEX

Install the frame after the wall has been finished.

Install Frame

If boxes are separate (see above), cut the frame to create individual frames.

To Cut Frame

Nail to studs using the top nailway and front two nailway tabs.

Separate Stud Bays

½" Nominal Shank Connections Available

Twist off small tip. Connect ⅝" O.D. compression fitting for air or water test.

Test the System

Tabs fold into metal stud for added rigidity.

Metal Stud Support

Slide bar into top channel. Secure bar to studs. Add bar to bottom as desired.

Between Studs