How to use the paper installation template. Cómo utilizar la plantilla de instalación de papel. Comment utiliser le gabarit d'installation du papier. 1. Place the paper installation template as shown. Place paper installation template so that the base line of paper installation template and the centerline of the toilet bowl match.
Perforated Line Section to be removed by installer. Línea Perforada Sección que debe retirar el instalador Ligne Perforée à enlever par l’installateur.
2 9/16" [65mm]
9” [229mm]
How to use the paper installation template. Cómo utilizar la plantilla de instalación de papel. Comment utiliser le gabarit d’installation du papier. 1. Place the paper installation template as shown. Place paper installation template so that the base line of paper installation template and the centerline of the toilet bowl match.
Placez le gabarit d’installation du papier de manière à ce que la ligne de base du gabarit d’installation du papier coïncide avec la ligne centrale de la cuvette des toilettes. Centerline of the outlet connection Línea central de la conexión de salida Ligne centrale du branchement de l’appareil
Base Line Línea base Ligne de base
Closet flange Brida del suelo Bride de sol
Base Line Línea base Ligne de base
Paper installation template Plantilla de instalación de papel Gabarit d’installation du papier
3 1/8" [79mm]
Coloque la plantilla de instalación de papel de manera que la línea base de plantilla cincida con la línea central del recipinte del excusado.
Base Line Línea base Ligne de base
2. Mark off the screw positions of the mounting blocks (2 pieces) as shown in the above drawing. Marque las posiciones de los tornillos de los bloques (2 pieza) de montaje como se muestra en el dibujo. Mesurez les positions des vis du bloc de montage (2 pièces) comme illustré sur la figure ci-dessus. 3. Remove the installation Templete and install the mounting blocks. Retire la plantilla de de instalación e instale los bloques de montaje. Retirez la gabarit d’installation et installez les blocs de montage. * To make installation easier, first bore preliminary holes into the floor. * Para facilitar la instalación, perfore primero los orificios preliminares en sl piso. * Pour une installation plus facile, percez tout d’abord des trous préliminaires dans le sol.
PAPER SIZE: 23" X 35" 25" X 38" 26" X 40". LINE WEIGHT: 1.00mm. PAPER SPEC: 70# OFFSET UNCOATED SHEET. BRIGHTNESS FACTOR- 86% OR HIGHER. MOUNTING HOLE ( 4 PLACES). AGUJERO DE MONTAJE ( 4 LUGARES). TROU POUR MONTAGE (4 ENDROITS). CUT ALONG THIS LINE.
plantilla cincida con la línea central del recipinte del excusado. Placez le gabarit d'installation du papier de manière à ce que la ligne de base du gabarit d'installation du papier coïncide avec la ligne centrale de la cuvette des toilettes. 1. Pla
26 may. 2011 - LT163, LT185 & LT480(G): Apply a bead of adhesive caulk on the bottom surface of the lavatory. See illustration. 5. Carefully set the lavatory on ...
Figura Uno. Figure l'Un. AB*782 (CLAYTON TILE IN). Tub Rim. AB*782 (Clayton). Represents Actual Tub Size. - Use to provide a guide for Framing a “Drop-in" installation. - Lines shown here are 1" inside actual rim dimension. - Do not exceed this dimen
17 jul. 2006 - Ignoring these symbols may cause personal injury and/or ..... de productos o piezas que sean defectuosos, siempre que dichos productos se ...
Perforated Line Section to be removed by installer. Línea perforada Sección que debe retirar el instalador. Ligne perforée Section à enlever par l'installateur. Wall this side / Pared este dirección / Direction du mûr. For 12" rough-in / Por tubería
CORTE A LO LARGO DE ESTA LINEA. DECOUPER AU LONG DE CETTE LIGNE. CORTAR NESTA LINHA si c138mm). RIM OF LAVATORY. BORDE DEL LAVABI. BORD DU LAVABO. 278 695mm]. 94• [251mm). — — — —. TOTO. IT-. 0 1 2 3. SCALE: 1 = 1. LT994G. OGU534. June 2015.
Page 1. 58" (136mm]. |TH. 0 1 2 3. SCALE: 1' = 1. RIM OF LAVATORY. BORDE DEL LAVABO. BORD DU LAVABO. 218" [542mm). CUT ALONG THIS LINE. CORTE A LO LARGO DE ESTA LINEA. DECOUPER AU LONG DE CETTE LIGNE. 82" [216mm]. ТОТО. LT995G. June 2015. OGU535.
Power supply. EcoPower. • Sensor detection time. Factory setting at six ... Max flow rate to be used with. TET2GA___________: 1.6 gpf. Confirm with local codes ...
INITIAL NI DE LA MAIN-D'CEUVRE OU AUTRES FRAIS ASSOCIÉS À L'INSTALLATION OU LA MANIPULATION, OULES. FRAIS DE RÉPARATION PAR DES TIERS, NI POUR TOUT .... VARY FROM STATE TO STATE OR PROVINCE TO PROVINCE. 6. To obtain warranty repair service under this
and function as a guiding principle Congratulations on your choice . CARE AND CLEANING your new faucet ... limiter provides 108ºf (42ºC) at first stop position, and prevents the temperature from exceeding 120ºf ... pressing the button, counter-clock
If you have questions regarding warranty policyor coverage, please contact TOTO U.S.A. Inc., Customer Service Department, 1155 SouthernRoad,. Morrow, GA ..... Drenaje (una vez a la semana). Grooves (six). Rainures (six). Ranuras (seis). Stoppers (six
as in Step 2. Secure the screws and check that it is assembled securely. 5 Turn on the wall and power adapter switches to confirm that the LED is lighting correctly. NOTE: When attaching the LED, make sure the upper and lower sides of the LED are pos
Install the bathtub securely in a stable location that can bear the weight of the bathtub in accordance with the Installation Guide. ○. Ensure that you have an ergonomic working ... Do not drop any heavy or hard objects in the bathtub. (Injury may re
Install the wall hanger per rough-in specification. • Apply sealant ... e. Damage or loss resulting from electrical surges or lightning strikes or other acts which are.
n oit c u d ort. nI. Names of Parts. Mount. Release Lever. Mount. Slide Hanger. Bar. There may be some variation between the drawings and your product, depending on the model number. 28 ..... residencial normal siempre que el comprador, usuario final
5 sept. 2008 - ... such as fire, earthquake, flood, thunder and/ or electrical storm, etc. b. ... your proof of purchase within 30 days of the original purchase date.
Self-generating hydropowered EcoPower system ... hydropowered, self-generating EcoPower System. Product ... Complies to California Green Building Code/.
Meets or exceeds ASME A112.18.1/CSA B125.1. • Certifications: IAPMO(cUPC), State of. Massachusetts, City of Los Angeles, and others. • Code Compliance: ...
Set Screw. Vis de blocage. Tornillo de presión. 9. Hex Wrench 2.5mm. Clé mâle de 2,5 mm. Llave hexagonal de 2.5 mm. 4. 5. Description. Description. Descripción. 1. Mounting Plate Hardware. Quincaillerie de plaque de montage Herrajes de la placa de mo
Do not use abrasive cleaners, steel wool or harsh chemicals as these will du" thé finish. Failure to follow these cleanîng ... a) Damage or Ioss sustained in a natural calamity such as fire, earthquake,flood,thunden electrical storm, etc. b) Damage or I