S10
1
Página :
GRT
Precios y cantidades de recursos requeridos por tipo Obra
0901245
Subpresupuesto Fecha Lugar
001 01/10/2011 230101
RECONSTRUCCION DE LA I.E. Nº 42002 CARLOS WIESSE, EN EL DISTRITO DE TACNA TACNA OBRAS PROVISIONALES Y DEMOLICIONES TACNA - TACNA - TACNA
Código
Recurso
Unidad
Cantidad
Precio S/.
0147010001 0147010002 0147010003 0147010004
CAPATAZ OPERARIO OFICIAL PEON
MANO DE OBRA hh 514.3280 hh 376.9633 hh 418.9382 hh 9,142.1498
15.37 13.97 12.29 11.36
0202010001 0202010002 0202010005 0202040009 0202040010 0205000031 0205010004 0205020021 0221000093 0226080066 0230460039 0230750101 0237990056 0238000000 0239040061 0239040062
0239040063 0239050000 0239130016 0243010003 0244000016 0244000020 0244030021 0253000002 0256010098
CLAVOS PARA MADERA CON CABEZA DE 1" CLAVOS PARA MADERA CON CABEZA DE 2 1/2" CLAVOS PARA MADERA CON CABEZA DE 3" ALAMBRE NEGRO # 16 ALAMBRE NEGRO # 8 PIEDRA DE 1/2" ARENA GRUESA PIEDRA GRANDE CEMENTO PORTLAND PUZOLANICO IP (Color Gris) BISAGRA CAPUCHINA PLOMA 3 1/2" X 3 1/2" SILICONA GIGANTOGRAFIA DE INFORMACION DE OBRA 2.40 X 3.60 M CANDADO TAMAÑO MEDIANO HORMIGON CAPACITACION EN SEGURIDAD Y SALUD RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRABAJO SEÑALIZACION TEMPORAL DE SEGURIDAD AGUA ESTERA DE CAÑA (2.00 X 3.00 m) MADERA TORNILLO PARA ENCOFRADOS MADERA TORNILLO CEPILLADA PALOS DE EUCALIPTO X 3mts TRIPLAY DE 4' X 8' X 4 mm PETROLEO DIESSEL # 2 CALAMINAS GALV.DE 1.83 x0.83
MATERIALES kg kg kg kg kg m3 m3 m3 bol
Parcial S/.Presupuestado S
7,905.25 5,266.13 5,148.77 103,854.82
7,904.04 5,266.35 5,144.96 103,859.91
122,174.98
122,175.26
0.8000 16.8000 30.3198 6.7510 6.3990 4.8960 3.7440 4.0320 52.1930
8.00 4.50 4.50 4.50 4.50 30.00 31.00 12.00 21.00
6.40 75.60 136.44 30.38 28.80 147.00 115.94 48.36 1,095.99
6.40 76.00 137.01 30.38 28.80 146.88 116.06 48.38 1,096.06
pza tub und
4.8000 1.0000 1.0000
5.00 8.00 200.00
24.00 8.00 200.00
24.00 8.00 200.00
pza m3 glb glb
1.6000 0.2750 1.0000 1.0000
20.00 21.00 2,000.00 2,000.00
32.00 5.88 2,000.00 2,000.00
32.00 5.78 2,000.00 2,000.00
glb m3 und p2 p2 und pln gl und
1.0000 1.4787 22.5011 411.3953 161.7525 114.9311 26.2000 409.4650 51.2000
1,500.00 10.00 18.00 6.00 6.00 10.00 25.00 13.00 12.00
1,500.00 14.80 405.00 2,468.40 970.50 1,149.30 655.00 5,322.98 614.40
1,500.00 14.79 405.06 2,468.37 970.52 1,149.11 655.40 5,323.05 614.40
19,055.17
19,056.45
10,000.00 3,000.00 7,136.85 1,245.76 59.12 8,354.70 928.20 2,405.55 1,856.40 128.00 59.12 59.12
10,000.00 3,000.00 7,133.64 1,245.76 59.14 8,354.10 928.49 2,408.25 1,856.21 127.97 59.14 59.14
35,232.82
35,231.84
176,462.96
176,463.55
EQUIPOS 0337010100 0337010101 0348040036 0348130082 0348900001 0349020094 0349020096 0349040091 0349060001 0349100007 0349900013 0349900061
EQUIPO DE PROTECCION INDIVIDUAL EQUIPO DE PROTECCION COLECTIVA CAMION VOLQUETE 15 m3 CAMION BARANDA 10 ton SIERRA CIRCULAR COMPRESORA NEUMATICA, 90HP, 250 P3 MANGUERA 15M X 3/4" CARGADOR FRONTAL 2.5 M3. MARTILLO NEUMATICO DE 21 kg MEZCLADORA DE CONCRETO TAMBOR 12 p3 TALADRO ELECTRICO ATORNILLADOR ELECTRICO 2500 RPM
glb glb hm hm hm hm hm hm hm hm hm hm
1.0000 1.0000 60.1154 8.0000 7.3939 92.8259 185.6441 17.3971 185.6441 5.1197 7.3939 7.3939
10,000.00 3,000.00 118.71 155.72 8.00 90.00 5.00 138.25 10.00 25.00 8.00 8.00
Total
S/. S/.
176,463.55
La columna parcial es el producto del precio por la cantidad requerida; y en la última columna se muestra el Monto Real que se está utilizando