pre-drill pilot holes using. 7/64” bit (See Fig. 2). Adjust the mounting brackets to line up with the holes and attach to the door using (4). #6 x 1/2” flat head screws.
12400 Earl Jones Way Louisville, KY 40299 rev-a-shelf.com 800-626-1126
SCALE HOLDER
TOOLS REQUIRED:
PARTS LIST No.
Description
1 Scale 4
A 7 64
#2
33 88
#1 #1
11 22
11 mm 44 3#2
B 111 16 88
#2
33 77 ESTIMATED ASSEMBLY TIME: 32 32 64 64
15 MIN 55 16 16
55 88
C
3 8
A
#2
#1
3
1 2
8 CARE AND MAINTENANCE:
Clean with a damp cloth and wipe parts dry.
Qty.
1 Holder8
1
Adjustable Mounting Brackets
4
#6 x 1/2”7Flat Head Screws
8
3 32
64
5 16
B
5 8
FIGURE 1
C
FIGURE 2
STEP 1
2” 2”
Attach adjustable mounting brackets to the back of the frame using (4) #6 x 1/2” flat head screws (See Figure 1). 1” 1”
2”
1”
90˚
90˚ 90˚
STEP 2
+
Mark preferred screw locations to the center of the thick portion of the door and pre-drill pilot holes using 7/64” bit (See Fig. 2) STEP 3 Adjust the mounting brackets to line up with the holes and attach to the door using (4) #6 x 1/2” flat head screws (See Figure 3).
FIGURE 3
+
+
Mark screw locations
+
FIGURE 4
STEP 4 Insert scale (not included) by pulling the handle back on the holder (See Figure 4).
INSTALLATION INSTRUCTIONS: SCALE HOLDER
I-4SH15-0519
12400 Earl Jones Way Louisville, KY 40299 rev-a-shelf.com 800-626-1126
INSTRUCCIONES DE INSTALACIÓN INSTRUCTIONS D’INSTALLATION SOPORTE DE ESCALA / PORTE-ÉCHELLE LISTA DE PARTES / LISTE DES PIÈCES
Herramientas requeridas: Outils Requis: 7 64
111 16 88
11 44
11 16 16
33 88
#2 #2
#1 #1
33 88
11 22
#2
3 mm
3 8
3 32
#2
Tiempo estimado de ensamblado Durée de l’installation: 33 32 32
77 64 64
15 MIN 55 16 16
55 88
#2
#1
3 8
1 2
5 16
1 4
No.
Description
Qty.
A
Soporte de escala / Porte-échelle
1
B
Soportes de Montaje Ajustables Supports de Montage Réglables
4
C
Tornillos de Cabeza Plana del #6 x 1/2” Vis a Tête Plate #6 x ½ po
8
1 8
#2
7 64
5 8
A
B
C
CUIDADO/ ENTRETIEN: Limpie con un paño húmedo y seque las partes. Nettoyez avec un linge humide et essuyez les piéces 2” 1” pour les secher complétement.
2” 2”
1” 1”
PASO 1 / ÉTAPE 1 90˚ 90˚
90˚
1
2
Sujete los soportes de montaje ajustables a la parte posterior del marco usando cuatro tornillos de cabeza plana del #6 x 1/2” (ver la figura 1).
+
+
Fixez les supports de montage réglables à l’arrière du cadre avec 4 vis à tête cylindrique #6 x 1/2 po (Voir l’Illustration 1).
PASO 2 / ÉTAPE 2 Marque las ubicaciones preferidas de los tornillos al centro de la porción gruesa de la puerta y pre taladre orificios piloto usando una broca de 7/64” (Ver la figura 2).
+
Mark screw locations
+
Marquez les emplacements choisis des vis au centre de la partie épaisse de la porte et pré percez les trous pilote avec un foret de 7/64 po (voir l’Illustration 2).
PASO 3 / ÉTAPE 3 Ajuste los soportes de montaje para que se alineen con los orificios y sujete con la puerta usando cuatro tornillos de cabeza plana (ver la figura 3).
3
4
Réglez les supports de montage pour les aligner avec les trous et attachez-les à la porte en utilisant 4 vis à tête cylindrique #6 x 1/2 po (Voir l’Illustration 3).
PASO 4 / ÉTAPE 4 Introduzca la báscula (no incluida) tirando hacia atrás de la palanca del soporte (ver figura 4). Insérez la balance (non incluse) en tirant sur le manche du support (Voir la Figure 4).
INSTALLATION INSTRUCTIONS: SOPORTE DE ESCALA / PORTE-ÉCHELLE
Figure C). Finally attach the optional handle and insert the waste container. Note: Handle should only be used if you are not using the optional Rev-a-shelf door.
assemble the trays to the cabinet door using #8 x 5/8” truss head. 7) Once the door is attached, loosen the clamp screw on the white plastic housing (approx.
Finally, replace the frame onto the slides then place your waste containers in the wire frame and the installation is complete. STEP 2. With the frame in a closed.
Mark preferred screw locations to the center of the thick portion of the door and pre-drill pilot holes using. 7/64” bit (See Fig. 2). Adjust the mounting brackets.
Parts List. No. Description. Qty. A. 27 or 35 Qt.Waste Containers. 2. B. Frame. 1. C. Braces. 2. D. Basket Wires. 2. E. Handle. 1. F. #8 x 3/4” Truss Head Screws. 4.
Measure drawer opening. I-TRIMWDI-1115. 2. Measure insert and mark cutting line. 12400 Earl Jones Way. Louisville, KY 40299 rev-a-shelf.com. 800-626-1126.
las 6:15 p. m. Completa las horas conocidas en la recta numérica y úsala ... Ava resolvió el problema de esta forma: 3:45 4:00. 5:00. 6:00 6:15. 15 min. 15 min.
3 mm. Installation screws must be in the thick section of cabinet door (outer rails). Requires 3-5/8â (92mm) of clearance between the wall cabinet shelves and the.
Top left hand slide. T-449FL-0219. 14-11/16â. (372.9 mm). 21-5/8â. (549.5 mm). 12400 Earl Jones Way. Louisville, KY 40299 rev-a-shelf.com. Customer Service: ...
4) Once tray is fitted inside cabinet, use silicon adhesive around the entire perimeter and any holes you made for plumbing. Take care to seal all the cuts to ...
hinges to begin to mount your door. Measure Opening Height ______. Measure Door Height ______. Height Difference ______. Divide Difference by 2 ______.
Note 1: Be sure to measure cabinet opening and basket width to make sure basket ... but note some taller items could hit the shelf when opening and closing.
Mark screw locations to the center of the thick portion of the door at least 12-1/2” from the bottom, pre-drill pilot holes, and attach wood frame to the door with the ...
Don't worry if it is off a little. This can all be adjusted. Double stick tape will hold the door in place while you screw the brackets to cabinet door (See. Figure 7).