Documento no encontrado! Por favor, inténtelo de nuevo

Status of the National Transport Plan and its impact on the ...

industrial y puertos de Zárate. RN 9. Access to industrial park and Zarate ports. Buenos Aires. 7 ... Safe Roads AU RN 5 Carlos Casares - Santa Rosa. RN 5.
6MB Größe 6 Downloads 112 vistas
Status of the National Transport Plan and its impact on the development of the country

ROADS

FREIGHT RAILWAYS

CHALLENGES ACROSS THE TRANSPORT SECTOR

• •

PORTS AND WATERWAYS

• Limitations on

infrastructure don’t allow the operation of large ships. • Lack of access infrastructure. • Loss of competitiveness.

40% of the network in poor conditions 95% of freight transported by truck.

AIR SECTOR

• • •

Low domestic connectivity. Half the number of pax/capita than in the rest of the region. Space for improvements in safety and air traffic control.

• 5%

the total freight • Average speed: 14km/hour

URBAN MOBILITY

• • •

15M users in MRBA. Absence of public transport in the provinces Low quality infrastructure.

VISION Carrying out the most ambitious Transport Plan in the history of the country, with a federal vision; integrated and intermodal transport that provides conditions of excellence for the mobility of people and goods; reduces transportation times, costs and negative externalities; and fundamentally maximizes safety, comfort and sustainability.

STRATEGIC GOALS INFRASTRUCTURE Transforming, developing and modernizing the infrastructure for transport in the country, through a federal strategy, improving the

connectivity and productivity of the regional economies, especially the ones that have been most left behind. PRIORIZATION Managing in an efficient and sustainable way the different modes of transport, to contribute to the economic growth and to

reduce the logistic costs, defending the interests of users. Prioritizing the sustainable modes of transport and the individual non-motorized mobility.

SAFETY Positioning security as the center of actions associated with transportation in all its forms and in a transversal way to all the areas of the Ministry.

EMPLOYMENT AND PEOPLE Strengthening quality work, favoring the generation of direct and indirect employment in the execution of works; The creation of new jobs based on the opportunities generated by the development of infrastructure; and ongoing training to

professionalizing and prioritizing public and private employment in the field of transportation. TRANSPARENCY

Eliminating corruption and ensuring transparency in purchases, contracting and control of works, as well as in all acts of government of the Ministry of Transport.

INVESTMENT PLAN 2016 - 2019

USD 33,270 Public investment (million USD)

Private investment 2016-2019

TOTAL

2016

2017

2018

2019

Air sector

250

360

400

450

1,350

2,810

Freight railways

100

500

1,550

1,550

500

4,200

Urban transport

750

2,750

3,000

3,000

Roads

1,900

2,100

3,000

3,000

2,000

12,000

Ports

10

50

100

100

4,500

4,760

3,010

5,760

8,050

8,100

8,350

33,270

TOTAL

9,500

NATIONAL ROAD NETWORK Long term plan for 2027

USD 12,000 M INVESTMENT 2015 – 2019

RN 7 - Lujan a Giles

JOB GENERATION: 100,000

2,800 km new highways 2,500 km safe roads 13,000 km rehabilitated roads 2500new engineering projects 250 Km km new pavings 2,000 825 works

USD 35,000 M Roads

LONG TERM PLAN 2027

Highways

Safe roads

We have already achieved 50%

INTEGRATION WITH CHILE Investment USD 1,500 M

BINATIONAL TUNNEL AGUA NEGRA

It will go through the Andes Mountain linking the province of San Juan (Argentina) and Coquimbo Region (Chile). Two independent tunnels 14 km long at 4.080m above sea level. Main advantages: ▶ Developing a logistic corridor from Porto Alegre, Brasil, up to Coquimbo in Chile to strengthen regional economies, offering a straight exit to the Pacific Ocean. ▶ Contributing to the diversion of flows in the Cristo Redentor System during seasonal closure due to bad weather conditions. ▶ Generating jobs, developing technology and capacity that will strengthen Argentinean road engineering sector.

CRISTO REDENTOR SYSTEM

Investment USD 750 M

Main border crossing between Argentina-Chile, with more than 4,5 M tons/year.

Roads

Main mountain chain crossing in Latin America. Daily mean transit of 2.100 vehicles (20% of which are trucks) Executive project for the first stage is currently being developed together with IADB.

LARGE INFRASTRUCTURE PROJECTS SANTA FE – PARANÁ BRIDGE

Investment USD 1,100 M

Currently in pre-project development.

Public tender planned for the fourth quarter 2017. 4.5 km in longitude; 50 m height. Access lanes from road 168 y connectivity with roads 14, 12 and 11.

CORRIENTES – RESISTENCIA BRIDGE

Investment USD 750 M

Executive project contracted with UTE Consulbaires-Consular-IATASA. Public tender planned for the fourth quarter 2017.

Roads

3.5 km in longitude and 30 meters in height. Access lanes from roads RN 11 y RN 12.

ROAD CORRIDORS – PUBLIC PRIVATE PARTNERSHIP 6,576 km under the new concession scheme of national roads 11 projects to be tendered by 2017 2,000 M USD investment expected in the next 5 years. ► 7,000 km of resurfaced roads and new hard shoulders. ► 1,400 km of new highways on high volume corridors. 11 PPP in total: 8 corridors (between 600 and 900 Km extension) & 3 access to ports (Bahía Blanca and Rosario, and South access of Buenos Aires)

Roads

Income from toll & fixed fee guaranteed by the National Government in the first 7 years (funded by resources from a fuel fund established by law).

Planned schedule: ► Data room: 7-2017. ► Tender: end of 2017.

IMPACT ON ECONOMY: Road asphalt production 2017 is projected to be the best year in history (580,000 TN).

March 2017 was the best month in history: 53,466 tn. (The previous record was November 1998)

Consumption of road asphalt 1998-2017 580.000

404,834

555,836 486,547

492,029 480,805 472,728 468,101 460,474 459,256 435,056 427,537 414,356 406,280 404,428 357,107 329,438

352,291 328,322

211,017 132,137

Roads

1998

1999

2000

2001

2002

2003

Road asphalt 1998 - 2015

2004

Selling of asphaltic plants

175.166

2005

2006

2007

2008

2009

2010

2011

2012

Real consumption 2016 - actuality

2013

2014

2015

2016

2017

Projection 2017

2013/15: average 4 plants per year 2016: 32 plants 1st quarter 2017: 4 plants per month

WHERE ARE WE GOING: Freight network completely rehabilitated and 15% of freight transported by train in 2035

Network fully enabled

Freight trains

JOB GENERATION:

TOTAL INVESTMENT USD 15,000 M

25,000 DIRECT Tns transported Km rehabilitated tracks

Renewed track Heavy maintenance

WHAT DID WE RECEIVE? Declining freight railways The average commercial speed of Belgrano Cargas is 14 km/h. 45% of the tracks (4,000 km) with caution alert, which led to a significant drop in average speed. 1.5 derailments per day in the Belgrano Cargas network and 1.3 cuts on tracks (1st half 2016) Authorized speed on rails: 1984 vs. 2016 55

1984

41

Freight trains

28

2016

14

Córdoba

0

Dean Funes

* Primer semestre 2016

Recreo

Frías

La Madrid

Tucumán

IN A YEAR THE NEW MANAGEMENT REVERTED THE TREND

TN

We reverted the trend in Revertimos la tendencia 2016 with an annual en 2016 con growth of 3% un crecimiento del 3%

Freight trains

-17%

The Belgrano Line had its best December with 121,418 Tn

-17%

-24%

-20%

Operational action groups: Time reduction of 56% in derailing liftings

year 13

RENEWAL OF BELGRANO CARGAS LINE 20,600 employments (direct + indirect). ► ► ►

Freight trains



Renewal of 1,593 km 38 months Investment: USD 2,600 M Chinese funding CMEC + CAF + Treasury

RENEWAL OF SAN MARTÍN LINE Renewal of 1,626 km

39 months

Investment USD 2,800 M 5 Provinces (Buenos Aires, Santa Fe, Córdoba, San Luis and Mendoza)

+ 200 M USD/year of savings in logistics.

Reduction of road accidents and reduction of GHG emission.

EFFICIENCY

72% of local input.

The cost of transport will decrease by 55%, on average for the 12 M Tns that will be derived from truck to train.

EXTERNALITIES

The project will generate 26,000 jobs (direct + indirect)

LOGISTIC COSTS

EMPLOYMENT

Freight trains

Solution of a limitation to the competitiveness of the regional economy. Operational costs will be reduced significantly due to the decrease of rolling material weariness and derailings (in 2016 there were 91)

RENEWAL OF ROCA LINE – VACA MUERTA Recovery 700 km

36 months

Investment + USD 530 M

Funding PPP

1 Pto. Bahía Blanca 20 km/ 50 M USD

2 Improvement/Renewal B. Blanca – Chipolletti 540 km/ 300 M USD 3 Renewal Chipollelti - C. Cordero 30 km / 30 M USD

The only viable alternative for transporting this volume.

Reduction on logistics costs for the transport of potassium (Project Vale). Reduction of road accidents and reduction of emission of GHG.

EFFICIENCY

2019 1.5 M Tn 2023 5 M Tn 2028 7 M Tn

EXTERNALITIES

The 4 stages of the project will generate 3,500 jobs.

FREIGHT VOLUME

EMPLOYMENT

Freight trains

4 New layout C. Cordero – Añelo 85 km / 150 M USD Time optimization on transport and therefore a reduction on operational costs. Improvement on capacity of standard transport TN/axis.

WHAT ARE WE DOING? Recovering the freight network Never in history there was such an investment on the freight network infrastructure.

USD 6 billions investment on infrastructure BELGRANO CARGAS Today we have 800 km of rails being renewed. In April 2017 we will have:

1,593 km of rails being renewed. ► USD 2,600 M investment. ► 20,600 employment generated (direct + indirect).

Freight trains



ROCA

SAN MARTÍN In 2018 we will begin the construction:

We began to negotiate: 700 km of rails to renew. ► USD 530 M investment. ► 3,500 employment generated (direct + indirect). ►

1,626 km of rails to renew. ► USD 2,800 M investment. ► 26,000 employment generated (direct + indirect). ►

17

IMPACT ON THE ECONOMY: MORE PRODUCTION AND PRIVATE INVESTMENT in stock centers and loading facilities. Private investment as a complement of public investment : 12 companies will add 1.5M Tn of capacity to the network with a USD 113 M investment Four of these companies are already investing USD 33 M

Pampa del Infierno Ramal C12

Charata Ramal C3

USD 12M

USD 3.4 M

Pampa del Infierno Freight trains

Ramal C12

17%

Tucumán Ramal C8

USD 8.4M

USD 9M

IMPACT ON ECONOMY: GROWTH ON PRODUCTION AND TRANSPORT MODAL SHARE TRAIN 103 M TN

Freight trains

TRAIN 22 M TN

RIVER/SEA 12 M TN

ROAD CAMIÓN 617 410MMTN tn

ROAD 410 M TN

2012 435M tn

RIVER/SEA 22 M TN

2030 735M tn

WHERE ARE WE GOING: MULTIPLY WATER CARGO. Modern ports. Predictable and safe navigation. Improve industry competitiveness.

Develop our merchant navy and increase domestic use.

Increase dredging through publicprivate partnerships.

INVESTMENT 2016 - 2019

USD 260 M WORKS ► ►

Ports and waterways

Infrastructure works in ports and waterways (improve navigation safety).

+

CURRENT PRIVATE INVESTMENT USD 2,500 M



2 ports for 30 M USD under construction 4 Works to start for 84 M USD 3 projected works for 31 M USD

IMPROVEMENTS IN PORTS’ ACCESS Eliminating bottle necks and improving bypasses ROSARIO

Investment USD 657 M

Road works and new accesses to Rosario Port (267 km)

Toepfer – Pto. de San Martín – Santa Fe

Rail accesses to new ports. Reduction of transport and operational costs in ports.

BAHÍA BLANCA

Investment USD 557M

Highway construction in the intersection of National Roads 3 and 252 and part of the beltway in road 33 (corridor linking Bahia Blanca with Rosario) Three-level distributor over the Cholo Crossing, instead of the current roundabout at ground level.

BUENOS AIRES

Puerto de San Martín – Santa Fe

Investment USD 900 M

Roads

Construction of “Paseo del Bajo”: access to Buenos Aires Port Building 11 km of highway between provincial road 11 and Industrial Park (Tecplata).

21 Buenos Aires 9

BUENOS AIRES PORT EXPANSION The most important container terminals of Argentina can handle in total 1,5 million TEUs. Investment in the layout of the terminals in order to increase capacity and receive new generations ships (Post-Panamax).

Ports and waterways

Current concessions expire in 2019 and we expect the tender process to be launched during 2017. Investments are estimated in around 2,000 M USD –including access infrastructure in order to increase capacity of the port.

ARGENTINA HAS ONE OF THE MOST IMPORTANT GRAINS’ EXPORT NODE Ports of Rosario - Timbúes

Terminal 6 Is one of the biggest grain exporter terminal in the World.

74 M TNS OF GRAINS AND SUBPRODUCTS 25 TERMINALS 4,700 TRUCK/DAY

Ports of Quequén

Ports and waterways

Historic exports record: it grew 45% compared to 2015, 7,7 million of tons

Ports of Bahía Blanca - Rosales

10,5 M of tons of grains and subproducts Subsecretaría de Planificación de Transporte de Cargas y Logística

Historic record in 2016 of 12.2 million tons (50% growth versus 2015).

BUENOS AIRES METROPOLITAN REGION

22,000,000

Quality public transport

daily trips PUBLIC TRANSPORT

15 MILLION INHABITANTS 2,590 KM2

49 %

39 %

6%

4%

BUS RAPID TRANSIT SYSTEM IN ARGENTINA Buenos Aires Metropolitan Area Completed Juan B. Justo 9 de Julio Sur Norte

25 de Mayo San Martín La Matanza

Under construction Tres de Febrero Del Bajo (Alem) Projected

Quality public transport

Morón)

2,5 million daily users

USD 14,187 M INTEGRAL PLAN FOR METROPOLITAN PASSENGER TRAINS (2016-2025) Investments in progress USD 816M Automatic Trains Stops

Quality public transport

USD 570M Railway renewal USD 100M Powering USD 731M New stations and technologies USD 3,240M 100% new rolling stock

Strategic works in progress

USD 3,244M Regional Express Network

USD 3,000M Undergrounding

USD 1,360M

Viaducts and PBN

USD 933M Electrification

USD 193M Workshops

USD 5,650 M

USD 8,537 M

REGIONAL EXPRESS NETWORK A. DEL VALLE

STAGE 1: ROCA (7 kms)

Belgrano Norte Line

1

900,000 San Martín Line

1,300,000

SAN MARTIN

Period 2017 – 2019 | Investment: USD 283 M NUÑEZ

2 a b c

Mitre Line

1,500,000 COLEGIALES

RETIRO

3,600,000 SAN MARTIN

10,800,000

LA PATERNAL

PLAZA MISERERE

CENTRAL ROCA

STAGE 2: MITRE – SARMIENTO (6 kms) TOTAL BENEFITED POPULATION 1 Up to Correo Central.

CORREO CENTRAL

Period: 2018 – 2021 | Investment: USD 484 M

Sarmiento Line

1,700,000 Quality public transport

CONSTITUCION

OESTE

1,700,000

CENTRAL SARMIENTO

2

Connection Sarmiento. Period: 2018 - 2023 | Investment: USD 438 M

STAGE 3: BELGRANO (7 kms)

SUR

BELGRANO SOUTH /BELGRANO NORTH.

5,500,000

Period: 2020 – 2023 | Investment: USD 760 M

Belgrano Sur Line

1,500,000

Connection Roca Central Station up to La Paternal. up to Colegiales. up to Nuñez.

Period: 2017 – 2021 | Investment: USD 1262 M

NORTE CASEROS

Up to Constitución underground station.

Roca Line

4,000,000

STAGE 4: EXTENSIONS RER 1

SAN MARTIN up to Caseros. Period: 2017 - 2021

VILLA SOLDATI

2

MITRE up to San Martín. Period: 2017 - 2021

3 TAPIALES

BELGRANO Sur hasta Tapiales. Plazo de la obra: 2021 - 2023

RAILWAY VIADUCTS IN BUENOS AIRES

Quality public transport

MITRE TIGRE | 110 M USD 21 months – September 2019

TOTAL INVESTMENT

385 M USD

SAN MARTÍN| 140 M USD 28 months – July 2019

BELGRANO SUR| 135 M USD 28 months – October 2018

Work in progress

Work in progress

ELECTRIFICATIONS

Electrification Roca

Electrification San Martín

250 M USD

520 M USD 480 M USD

Electrification Belgrano Sur

Re-electrification Mitre

Electrification Belgrano Norte

783 M USD

602 M USD

Quality public transport

WORK IN PROGRESS

Electrification Roca line

SARMIENTO´S UNDERGROUNDING Invesments in progress

WORK IN PROGRESS

TOTAL INVESTMENT

Quality public transport

Actualizar ambas imágenes con avance de obra – mostrar el tunel

Elimination of 49 low level crossings 20,000 daily vehicles 180,000 daily passangers 25% travel time reduction

U$S 3,000 M

AUTOMATIC TRAIN STOP (ATS) Investing in safety

Contract granted to 300 million passengers per year 8 railway lines (Urquiza, Belgrano Norte, Belgrano Sur, Roca, Mitre, San Martín and Sarmiento)

Quality public transport

1,462 km of rail

WORK IN PROGRESS

260 M USD

FUTURE TENDER OF ROLLING STOCK – URBAN TRAINS ONE OF THE BIGGEST ROLLING STOCK TENDERS OF THE YEAR Detail Broad Gauge Electric Cars (1676/25Kv, 50Hz)

Numbers of Train

Quality public transport

Electric Train Maintanance

Units

Total

2017

2018

2019

2020

2021

2022

2023

2024

2025

USD M

1,806

6,24

6,24

41,6

95,68

166,4

182

310,96

540,8

459,08

Units

174

0

0

4

8

16

16

26

52

52

USD M

45,9

1,8

3,6

9

10,8

20,7

Units

51

2

4

10

12

23

0

0

0

0

3 DATA ROOM in January – 12 internacional companies – 485 business inquiries COMPANY

Financing conditions Lead time

ALSTOM

COUNTRY

COMPANY

COUNTRY

France

MITSUBISHI

Japan

TALGO

España

KBR

USA

BOMBARDIER

Germany

STADLER RAIL

Switzerland

SIEMENS

Germany

CAF

Spain

CRRC

China

TRANSMA HOLDING

Russia

HYUNDAI ROTEM

Korea

MARUBENI

Japan

AIR MARKET Doubling the number of domestic passengers Ezeiza’s airport today

Enhanced domestic and international connectivity

More routes and frequencies Airplane revolution

Ezeiza’s new airport

Additional safety

Better travel experience

NEW COMPANIES AVIANCA LOCAL INVESTMENT PLANS USD 220 millions 12 ATR – 600 + Embraer 190 450 direct jobs

Airplane revolution

NORWEGIAN LOCAL INVESTMENT PLANS USD 1.5-1.9 B 40 airplanes (approx. 27 purchase and 13 by leasing)

1,250 direct jobs

MODERNIZING AIRPORT INFRASTRUCTURE, INVESTMENT IN NEW TECHNOLOGY AND EQUIPMENT Aeroparque’s airport today

INVESMENT 2016 – 2019

1,400 M USD 3x the investment of the previous 4 years

Airplane revolution

New Aeroparque’s airport

19 airports

Iguazú

8 AIRPORTS ALREADY COMPLETED Córdoba Mendoza Río Gallegos Salta Trelew Iguazú Chapelco Tucumán

Trelew

Airplane revolution

Tucumán

Córdoba

Mendoza

9 AIRPORTS WORKS IN PROGRESS Comodoro Rivadavia Aeroparque Ezeiza Jujuy Salta San Fernando San Juan San Luis Bariloche

Comodoro Rivadavia

Airplane revolution

Ezeiza

Jujuy

Aeroparque

TRANSPARENCY - PROGRESS IN TENDERING PROCESSES Main actions: Online (web) publishing of all processes and documents, available openly and for free. Advance publication of general guidelines + Procedural Manual.

Mechanisms to avoid cartelization. Opening internal borders and tenders for international companies. New tendering strategies (lump-sum processes, possibility of improving offers) Adequacy of HR and internal processes. Adequacy of tender documents

Improvement in tendering processes times

Tenders 2017 Expected tender figures 2017 # TENDERS

BUDGET (USD)

Highways and roads

94

USD 6,687 M

Railways

27

USD 891 M

8

USD 2,510 M

62

USD 750 M

5

USD 109 M

196

USD 10,947 M

SECTOR

Urban Transport Airports Ports

TOTAL

ROADS 182 future tenders 2017 - 2019 : 10,082 M USD Contact: Javier Iguacel (Presidente, DNV) [email protected] Category

Description

Road

Section

Province

Budget (Million USD)

Tender

Source of funding

Highway

NOA corridor

RN 9

T-04: Access to Tucumán

Tucumán

21

may-17

Treasury

Highway

NOA corridor

RN 9

T-04: Access to Tucumán

Tucumán

13

may-17

Treasury

Repaving

Paving RP 126 (Corrientes)

RP 126

T-01: Int. RN 14 - Curuzú Cuatiá

Corrientes

19

may-17

Treasury - CAF

Repaving

Paving RP 126 (Corrientes)

RP 126

T-02: Curuzú Cuatiá - Sauce

Corrientes

24

may-17

Treasury - BIRF

Paving

Paving RP 126 (Corrientes)

RP 126

T-03: Sauce - Int. RN 12

Corrientes

48

may-17

Treasury - N/S

Highway

AU RN 5 Luján - Carlos Casares

RN 5

T03: Mercedes - Suipacha

Buenos Aires

58

may-17

Treasury

Paving

Paving RP 40 Int. RN 123 - Int. RP 41

RP 40

Int. RN 123 - Int. RP 41

Corrientes

27

may-17

Treasury - BID

Highway

Rehabilitation and access to Barranqueras

RN 16

Distribuidor Acceso a Barranqueras

Corrientes Chaco

9

may-17

Treasury

Repaving

Rehabilitation and access a Barranqueras

RN 16

Rehabilitation of road accesso to Barranqueras.

Chaco

5

may-17

CAF

Others

Rehabilitation and access a Barranqueras

Many

Parking for trucks

Chaco

4

may-17

CAF

Repaving

Corridor NOA

RN 66

Int. RN 9 - Int. RN 34

Jujuy

23

may-17

Treasury

Recovery and maintenance

Crema MALLA 104

RN 152 / RN 143

Int. RN35 - Chacharramendi

La Pampa

24

may-17

Treasury

ROADS 182 future tenders 2017 - 2019 : 10,082 M USD Contact: Javier Iguacel (Presidente, DNV) [email protected] Category

Description

Road

Section

Province

Budget Tender (Million USD)

Source of funding

Recovery and maintenance

Crema MALLA 408a

RN 60 / RN 157

T-01: Lte. Cordoba -Emp.Rn157 ; T-02: Int. RN60 Frias

Catamarca

24

may-17

Treasury

Recovery and maintenance

Crema MALLA 408d

RN 157

Acc. Frías - Int. RP329

Tucumán

24

may-17

Treasury

RN 3

T-03: Variante a S. M. Monte

Buenos Aires

49

may-17

Treasury

RN 237/RN 234

T-01: Int. RP 27 - Pte A° Limay Chico ; T-02: Int. RN 40 - Int. RN 237

Neuquén

27

may-17

Treasury

Highway Recovery and maintenance

Highway Cañuelas - Olavarría Crema MALLA 131

Highway

AU RN 95 urban road Saenz Peña

RN 95

Calle 251 (km 1109,4) - Calle 351 (km 1115,7)

Chaco

12

may-17

CAF

Highway

AU RN 40 Mendoza - San Juan

RN 40

T01: Acc. Aeropuerto El Plumerillo - Lte. Me/SJ

Mendoza

178

may-17

Treasury

Highway

AU RN 33 Rufino - Rosario

RN 33

T-04: Cnia. Las Flores - Pérez

Santa Fé

153

may-17

Treasury

Safe Roads

AU RN 158 San Francisco - Río Cuarto

RN 58

San Francisco - Río Cuarto

Córdoba

86

may-17

Treasury

Safe Roads

AU RN 158 San Francisco - Río Cuarto

RN 158

San Francisco - Río Cuarto

Córdoba

90

may-17

Treasury

Highway

AU RN 20 Caucete - San Juan

RN 20

Caucete - San Juan

San Juan

50

may-17

Treasury

Repaving

Reconstruction RN 152 Gral. Acha Puelches

RN 152

Gral. Acha – Puelches

La Pampa

33

jun-17

Treasury

Corredor RN 3 Tierra del Fuego

RN 3

Corredor Tierra del Fuego

Tierra del Fuego

29

jun-17

Treasury

Safe Roads RN 11 Formosa - Clorinda

RN 11

T-05: Circunvalación a Formosa

Formosa

33

jun-17

Treasury

Safe Roads

Highway

ROADS 182 future tenders 2017 - 2019 : 10,082 M USD Contact: Javier Iguacel (Presidente, DNV) [email protected] Category Highway

Description AU RN 8 Pergamino - Venado

Budget Tender (Million USD)

Source of funding

Road

Section

Province

RN 8

Variant Venado Tuerto

Santa Fé

38

jul-17

Treasury

RN 0259

T-01: Futaleufú - Int. RN 40

Chubut

4

jul-17

Treasury

Paving

Road Corridor RN 40 Los Cipreses - Samoré

Paving

Safe Roads RN 40 San Juan - SJ Jáchal

RN 40

T-02: Talacasto - Int. RN 150

San Juan

54

jul-17

Treasury

Paving

New RN 151 Neuquén - Dique Ballester

RN 151

T-07: Int. RP 7 - Int. RN 1V22

Neuquén

13

jul-17

Treasury

Highway

Corridor NOA

RN 34

T-06: Rosario de la Frontera - Acc. A Salta

Salta

75

jul-17

Treasury

Special Work

Corridor NOA

RN 34

T-06: Rosario de la Frontera - Acc. A Salta

Salta

89

jul-17

Treasury

Special Work

Corridor NOA

RN 34

T-06: Rosario de la Frontera - Acc. A Salta

Salta

89

jul-17

Treasury

Reconstruction RN 149 Calingasta - Las Flores

RN 149

T-02: Calingasta - Iglesia

San Juan

35

ago-17

Treasury

Paving RN 149 Uspallata - Barreal

RN 149

T-01: Uspallata - Calingasta

Mendoza

21

ago-17

Treasury

Ruta Nueva Paving Highway

NOA Corridor

RN 9

T-03: Termas de R° Hondo - Tucumán

Tucumán

126

ago-17

Treasury

Highway

NOA Corridor

RN 9

T-03: Termas de R° Hondo - Tucumán

Tucumán

84

ago-17

Treasury

Highway

NOA Corridor

RN 34

T-07: Acc. A Salta - San Pedro de Jujuy

Salta

44

ago-17

Treasury

Highway

AU RN 33 Rufino - Rosario

RN 33

T-02: San Eduardo - Chovet

Santa Fé

204

sep-17

Treasury

ROADS 182 future tenders 2017 - 2019 : 10,082 M USD Contact: Javier Iguacel (Presidente, DNV) [email protected] Category

Description

Road

Section

Province

Budget(Milli on USD)

Tender

Source of funding

Highway

AU RN 34 Rosario - Sunchales

RN 34

T-03: San Genaro - Cañada Rosquín

Santa Fé

122

sep-17

Treasury

Highway

AU RN 34 Rosario - Sunchales

RN 34

T-04: Cañada Rosquín - Int. RN 19

Santa Fé

134

sep-17

Treasury

Paving National Road N° 78 - Tramo: Chilecito - Tinogasta - Sección

RN 78

Chilecito - Tinogasta

La Rioja, Catamarca

7

sep-17

Treasury

Cerma MALLA 204

RN 9

Villa del Totoral - Lte. Santiago del Estero

Córdoba

17

sep-17

Treasury

Cerma MALLA 504

RN 14

Lte. Corrientes - Campo Grande

Misiones

23

sep-17

Treasury

Cerma MALLA 539

RN 14

Campo Grande - Int. RP 20

Misiones

23

sep-17

Treasury

AU RN 5 Carlos Casares - Santa Rosa

RN 5

Anguil - Int. RN 35

La Pampa

80

sep-17

Treasury

Santa Fe

65

oct-17

Treasury

Paving Recovery and maintenance Recovery and maintenance Recovery and maintenance Highway Special Work

Access to Ports of Rosario

RM VARIAS Accesos a Terminales de Timbués y San Martín

Safe Roads

AU RN 14 Libres - Posadas

RN 14

Paso de los Libres - Posadas

Corrientes

26

oct-17

Treasury

Safe Roads

Safe Roads RN 14 San José - San Vicente

RN 14

San José - San Vicente

Misiones

30

oct-17

Treasury

Safe Roads

Safe Roads RN 14 San José - San Vicente

RN 14

San José - San Vicente

Misiones

32

oct-17

Treasury

Safe Roads

Safe Roads RN 14 San José - San Vicente

RN 14

San José - San Vicente

Misiones

31

oct-17

Treasury

Safe Roads

AU RN 34 Sunchales - Taboada

RN 34

Sunchales - Taboada

32

oct-17

Treasury

Safe Roads

AU RN 34 Sunchales - Taboada

RN 34

Sunchales - Taboada

21

oct-17

Treasury

Santiago del Estero Santiago del Estero

ROADS 182 future tenders 2017 - 2019 : 10,082 M USD Contact: Javier Iguacel (Presidente, DNV) [email protected] Category Safe Roads

Description AU RN 34 Sunchales - Taboada

Road

Section

Province

Budget (Million USD)

Tender

Source of funding

RN 34

Sunchales - Taboada

Santiago del Estero

30

oct-17

Tresuary

Highway

Access to Ports of Rosario

RN A12

Int. RN 9 (a Bue) - Int. RN 11

Santa Fé

120

sep-17

Treasury

Highway

Access to Ports of Rosario

RN A12

Int. RN 9 (a Bue) - Int. RN 11

Santa Fé

75

sep-17

Treasury

Highway

Access to Ports of Bahía Blanca

RN 3

T-01: Paso Urbano por Bahía Blanca

Buenos Aires

49

oct-17

PPP

Highway

AU RN 205 Cañuelas - Saladillo

RN 205

T-01: Cañuelas - Lobos

Buenos Aires

108

oct-17

PPP

Highway

AU Cañuelas - Olavarría

RN 3

T-05: Las Flores - Azul

Buenos Aires

110

oct-17

PPP

Highway

AU Cañuelas - Olavarría

RN 3

T-05: Las Flores - Azul

Buenos Aires

140

oct-17

PPP

National Road N° 9 - Acceso Parque industrial y puertos de Zárate

RN 9

Access to industrial park and Zarate ports

Buenos Aires

7

oct-17

PPP

Highway

AU RN 5 Luján - Carlos Casares

RN 5

T04: Suipacha - Chivilcoy

Buenos Aires

70

oct-17

PPP

Highway

AU Cañuelas - Olavarría

RN 3

T-04: S. M. Monte - Las Flores

Buenos Aires

65

oct-17

PPP

Highway

AU Cañuelas - Olavarría

RN 3

T-04: S. M. Monte - Las Flores

Buenos Aires

99

oct-17

PPP

Highway

AU RN 33 Bahía Blanca - Pigüé

RN 33

T-02: Bahía Blanca - Pigüé

Buenos Aires

90

oct-17

PPP

Special Work

ROADS 182 future tenders 2017 - 2019 : 10,082 M USD Contact: Javier Iguacel (Presidente, DNV) [email protected] Category

Description

Road

Section

Province

Budget (Million USD)

Tender

Source of funding

Special Work

Cristo Redentor System

RN 7

T03: Potrerillos - Uspallata

Mendoza

60

oct-17

PPP

Special Work

Cristo Redentor System

RN 7

T05: Uspallata - Acc. Tunel Libertadores

Mendoza

100

oct-17

PPP

Highway

AU RN 3 Azul - Bahía Blanca

RN 3

T-03: Dorrego - Bahía Blanca

Buenos Aires

103

oct-17

PPP

Highway

AU RN 3 Azul - Bahía Blanca

RN 3

T-03: Dorrego - Bahía Blanca

Buenos Aires

90

oct-17

PPP

Safe Roads

AU RN 34 La Banda - Rosario de la Frontera

RN 34

La Banda - Rosario de la Frontera

Santiago del Estero

32

oct-17

Treasury

Safe Roads

AU RN 34 La Banda - Rosario de la Frontera

RN 34

La Banda - Rosario de la Frontera

Salta

22

oct-17

Treasury

AU RN 22 Cipoletti - Zapala

RN 22

T-02: Cipoletti - Neuquén

Neuquén

100

oct-17

Treasury

NOA Corridor

RN 34

T-01: Taboada - La Banda

Santiago del Estero

181

oct-17

Treasury

AU Cañuelas - Olavarría

RN 226

T-06: Azul - Olavarría

Buenos Aires

29

oct-17

PPP

RN 3

Azul - Bahía Blanca

Buenos Aires

12

oct-17

PPP

RN 5

Carlos Casares - Santa Rosa

Buenos Aires

9

oct-17

PPP

RN 5

Carlos Casares - Santa Rosa

La Pampa

14

oct-17

Treasury

Special Work Highway Special Work Safe Roads Safe Roads

Safe Roads

AU RN 3 Azul - Bahía Blanca AU RN 5 Carlos Casares - Santa Rosa AU RN 5 Carlos Casares - Santa Rosa

ROADS 182 future tenders 2017 - 2019 : 10,082 M USD Contact: Javier Iguacel (Presidente, DNV) [email protected] Category

Description

Safe Roads Safe Roads RN 38 La Rioja - Alberdi

Road

Section

Province

Budget (Million USD)

Tender

Source of funding

RN 38

La Rioja - Alberdi

Tucumán

34

oct-17

Treasury

Highway

AU RN 11 Resistencia - Formosa

RN 11

T-02: Resistencia - Int. RP 90

Chaco

36

nov-17

Treasury

Highway

AU RN 33 Rufino - Rosario

RN 33

T-05: Pérez - Int. RN A008

Santa Fé

27

nov-17

Treasury

Safe Roads AU RN 5 Carlos Casares - Santa Rosa

RN 5

Carlos Casares - Santa Rosa

Buenos Aires

24

nov-17

PPP

Safe Roads Corridor Iberá

RN 12

Corredor del Iberá

Corrientes

24

nov-17

Treasury

RN 12

Corrientes - Posadas

Corrientes

72

dic-17

Treasury

Safe Roads AU RN 9 Córdoba - Santiago del Estero

RN 9

Córdoba - Santiago del Estero

Córdoba

22

dic-17

Treasury

Safe Roads AU RN 9 Córdoba - Santiago del Estero

RN 9

Córdoba - Santiago del Estero

Santiago del Estero

23

dic-17

Treasury

Safe Roads AU RN 9 Córdoba - Santiago del Estero

RN 9

Córdoba - Santiago del Estero

Santiago del Estero

29

dic-17

Treasury

RePaving RN 16 RSP - Salta

RN 16

T-02: Lte. Cha/Sgo - Lte. Sgo/Cha

Santiago del Estero

22

dic-17

Treasury

Road connection to Resistencia bridge and Corrientes capital

Many

New bridge Resistencia - Corrientes

Corrientes - Chaco

900

dic-17

PPP

Highway

Repaving Special work

AU RN 12 Corrientes - Posadas

ROADS 182 future tenders 2017 - 2019 : 10,082 M USD Contact: Javier Iguacel (Presidente, DNV) [email protected]

Description

Road

Section

Province

Budget (Million USD)

Tender

Source of funding

Special Wok Bridge Santo Tomé - Santa Fe

RN 11

Conexión Vial Santa Fe - Santo Tomé

Santa Fé

140,0

01/01/2018

TBC

RN 1V11

Int. RN A012 - Int. AP 01

Santa Fé

117,0

01/01/2018

Treasury

RN 3

T-01: Paso Urbano por Bahía Blanca

Buenos Aires

71,5

01/01/2018

PPP

RN 0252

T-01: Paso Urbano por Bahía Blanca

Buenos Aires

84

01/01/2018

PPP

RN A005

Int. RN 8 - Int. RN 36

Córdoba

51,6

01/01/2018

Treasury

RN 12

Corrientes - Posadas

Corrientes

21,3

01/01/2018

Treasury

RP 1

T-08: San Pedro - Pichanal

Jujuy

31,2

01/01/2018

Tresury - BID

Special Wok Cristo Redentor System

RN 7

T06: Adecuación de Túnel Libertador y Caracoles

Mendoza

200

01/01/2018

PPP

Safe Roads AU RN 11 Santa Fe - Reconquista

RN 11

Santa Fé - Reconquista

Chaco

21,1

31/01/2018

Treasury

Safe Roads AU RN 14 Libres - Posadas

RN 14

Paso de los Libres - Posadas

Corrientes

30,6

31/01/2018

Treasury

Safe Roads AU RN 35 Realicó - Río Cuarto

RN 35

Realicó - Río Cuarto

Córdoba

37,5

31/01/2018

Treasury

RN A030

Road Corridor Resistencia - Corrientes

Chaco

20

31/01/2018

Treasury

Category

Special Wok Access to Ports of Rosario Highway

Access to Ports of Bahía Blanca

Special Wok Access to Ports of Bahía Blanca Highway

AU RN A005 Circunvalación Río Cuarto

Safe Roads AU RN 12 Corrientes - Posadas Repaving

Repaving RP 1 Jujuy

Safe Roads Road Corridor Resistencia - Corrientes

ROADS 182 future tenders 2017 - 2019 : 10,082 M USD Contact: Javier Iguacel (Presidente, DNV) [email protected] Category

Description

Safe Roads

AU RN 3 Azul - Bahía Blanca

Safe Roads

AU RN 9 Córdoba - Santiago del Estero

Safe Roads

AU RN 22 Bahía Blanca - Chichinales

Safe Roads

AU RN 22 Bahía Blanca - Chichinales

Safe Roads

AU RN 34 Sunchales - Taboada

Safe Roads

AU RN 34 Sunchales - Taboada

Safe Roads

Safe Roads RN 127 Paraná - RN 14

Safe Roads

Safe Roads RN 127 Paraná - RN 14

Safe Roads

Safe Roads RN 127 Paraná - RN 14

Safe Roads

Safe Roads RN 127 Paraná - RN 14

Highway

AU RN 117 Santa Tomé - Libres

Safe Roads

AU RN 8 Río Cuarto - Villa Mercedes

Safe Roads

AU RN 8 Río Cuarto - Villa Mercedes

Safe Roads

AU RN 22 Bahía Blanca - Chichinales

Road

Section

Province

Budget (Million USD)

Tender

Source of funding

RN 3

Azul - Bahía Blanca

Buenos Aires

20,7

31/01/2018

PPP

RN 9

Córdoba - Santiago del Estero

Córdoba

21

31/01/2018

Treasury

RN 22

Bahía Blanca - Chichinales

Río Negro

21

31/01/2018

Treasury

RN 22

Bahía Blanca - Chichinales

Río Negro

11,4

31/01/2018

Treasury

RN 34

Sunchales - Taboada

Santa Fé

18

31/01/2018

Treasury

RN 34

Sunchales - Taboada

Santa Fé

21

31/01/2018

Treasury

RN 0127

Paraná - RN 14

Entre Ríos

22,5

31/01/2018

Treasury

RN 0127

Paraná - RN 14

Entre Ríos

19,2

31/01/2018

Treasury

RN 0127

Paraná - RN 14

Entre Ríos

24,9

31/01/2018

Treasury

RN 0127

Paraná - RN 14

Corrientes

12

31/01/2018

Treasury

RN 0117

Int. RN 14 - Paso Intl. Libres

Corrientes

6,7

01/02/2018

Toll

RN 8

Río Cuarto - Villa Mercedes

Córdoba

22,5

03/03/2018

Treasury

RN 8

Río Cuarto - Villa Mercedes

San Luis

9,0

03/03/2018

Treasury

RN 22

Bahía Blanca - Chichinales

Buenos Aires

21,9

03/03/2018

PPP

49

ROADS 182 future tenders 2017 - 2019 : 10,082 M USD Contact: Javier Iguacel (Presidente, DNV) [email protected] Category

Description

Road

Section

Province

Budget (Million USD)

Tender

Source of funding

Safe Roads

AU RN 22 Bahía Blanca - Chichinales

RN 0022

Bahía Blanca - Chichinales

La Pampa

18,6

03/03/2018

Treasury

Safe Roads

AU RN 22 Bahía Blanca - Chichinales

RN 0022

Bahía Blanca - Chichinales

Río Negro

9,6

03/03/2018

Treasury

Safe Roads

AU RN 22 Bahía Blanca - Chichinales

RN 0022

Bahía Blanca - Chichinales

Río Negro

3,3

03/03/2018

Treasury

AU RN 34 Rosario - Sunchales

RN 0034

T-02: Int. RN A012 - San Genaro

Santa Fé

57,0

01/04/2018

Treasury

Safe Roads

Corridor Iberá

RN 0123

Corridor Iberá

Corrientes

16,6

02/04/2018

Treasury

Safe Roads

Safe Roads RN 174 Rosario - Villaguay

RN 0174

Rosario - Villaguay

Entre Ríos

17,4

02/04/2018

Treasury

Safe Roads

AU RN 11 Santa Fe - Reconquista

RN 0011

Santa Fé - Reconquista

Santa Fé

64,5

02/04/2018

Treasury

Safe Roads

AU RN 11 Santa Fe - Reconquista

RN 0011

Santa Fé - Reconquista

Santa Fé

60,0

02/04/2018

Treasury

Safe Roads

Safe Roads RN 14 San José - San Vicente

RN 0014

San José - San Vicente

Misiones

18,0

02/04/2018

Treasury

Safe Roads

Corridor NOA

RN 0065

Corridor NOA

Santiago del Estero

49,0

02/04/2018

Treasury

Safe Roads

Safe Roads RN 237 R° Collón Curá Bariloche

RN 0237

R° Collón Curá - Bariloche

Neuquén

13,3

02/04/2018

Treasury

Safe Roads

Safe Roads RN 237 R° Collón Curá Bariloche

RN 0237

R° Collón Curá - Bariloche

Neuquén

13,3

02/04/2018

Treasury

Special Wok

Access to Ports of Rosario

RP 0010

Int. RN A012 - Int. AP 01

Santa Fé

7,5

02/04/2018

Treasury

Repaving RN 16 RSP - Salta

RN 0016

T-02: Lte. Cha/Sgo - Lte. Sgo/Cha

Santiago del Estero

17,3

01/05/2018

Treasury

Highway

Repaving

ROADS 182 future tenders 2017 - 2019 : 10,082 M USD Contact: Javier Iguacel (Presidente, DNV) [email protected] Road

Section

Province

Budget (Million USD)

Tender

Source of funding

Repaving RN 16 RSP - Salta

RN 0016

T-02: Lte. Cha/Sgo - Lte. Sgo/Cha

Santiago del Estero

13,8

01/05/2018

Treasury

Safe Roads

AU RN 33 Bahía Blanca - Pigüé

RN 0033

Bahía Blanca - Pigüé

Buenos Aires

18,6

03/05/2018

PPP

Safe Roads

AU RN 32 Pergamino - Rosario

RN 0032

Pergamino - Rosario

Buenos Aires

14,4

03/05/2018

PPP

Safe Roads

AU RN 32 Pergamino - Rosario

RN 0032

Pergamino - Rosario

Santa Fé

17,4

03/05/2018

Treasury

Highway

Repav Au 7 San Luis

RN 0007

Variante Desaguadero

Mendoza

30,0

01/06/2018

Treasury

Highway

AU RN 229 Bahía Blanca - Punta Alta

RN 0229

T-03: Dorrego - Bahía Blanca

Buenos Aires

25,9

03/06/2018

PPP

Safe Roads

AU RN 3 Azul - Bahía Blanca

RN 0003

Azul - Bahía Blanca

Buenos Aires

15,9

03/06/2018

PPP

Special Wok

Cristo Redentor System

RN 0007

T04: Variante Uspallata

Mendoza

25,0

01/07/2018

PPP

Special Wok

Road Corridor Resistencia - Corrientes

RN A030 T-02: Segundo Bridge Resistencia - Corrientes Chaco - Corrientes

600,0

01/07/2018

Treasury

Special Wok

Access to Ports of Rosario

RP 0091

Int. RN A012 - Int. AP 01

Santa Fé

17,5

01/07/2018

Treasury

Special Wok

Vial Integration Santa Fe - Paraná

RN A007

T-02: Bridge SF-Paraná

Santa Fé-Entre Ríos

500,0

01/07/2018

Treasury

Category

Repaving

Description

ROADS 182 future tenders 2017 - 2019 : 10,082 M USD Contact: Javier Iguacel (Presidente, DNV) [email protected] Road

Section

Province

Budget (Million USD)

Tender

Source of funding

Safe Roads Vial Integration Santa Fe - Paraná

RN A007

Vial Integration Santa Fe - Paraná

Entre Ríos

14,0

01/07/2018

Treasury

Safe Roads AU RN 3 Azul - Bahía Blanca

RN 0003

Azul - Bahía Blanca

Buenos Aires

15,0

03/07/2018

PPP

Safe Roads AU RN 5 Carlos Casares - Santa Rosa

RN 0005

Carlos Casares - Santa Rosa

Buenos Aires

15,3

03/07/2018

PPP

Safe Roads Corridor NOA

RN 0009

Corridor NOA

Tucumán

13,8

03/07/2018

Toll

Safe Roads Corridor NOA

RN 0009

Corridor NOA

Tucumán

15,0

03/07/2018

Toll

Safe Roads Safe Roads RN 33 Pigüé - Rufino

RN 0033

Pigüé - Rufino

Buenos Aires

18,3

03/07/2018

PPP

Safe Roads Safe Roads RN 33 Pigüé - Rufino

RN 0033

Pigüé - Rufino

Buenos Aires

18,0

03/07/2018

PPP

Safe Roads Safe Roads RN 33 Pigüé - Rufino

RN 0033

Pigüé - Rufino

Buenos Aires

19,2

03/07/2018

PPP

Safe Roads Safe Roads RN 33 Pigüé - Rufino

RN 0033

Pigüé - Rufino

Buenos Aires

19,5

03/07/2018

PPP

Safe Roads Safe Roads RN 33 Pigüé - Rufino

RN 0033

Pigüé - Rufino

Buenos Aires

15,0

03/07/2018

PPP

Safe Roads Safe Roads RN 33 Pigüé - Rufino

RN 0033

Pigüé - Rufino

Buenos Aires

15,6

03/07/2018

PPP

Safe Roads Safe Roads RN 33 Pigüé - Rufino

RN 0033

Pigüé - Rufino

Buenos Aires

15,0

03/07/2018

PPP

Safe Roads AU RN 188 San Nicolás - Junín

RN 0188

San Nicolás - Junín

Buenos Aires

11,4

03/07/2018

PPP

Category

Description

ROADS 182 future tenders 2017 - 2019 : 10,082 M USD Contact: Javier Iguacel (Presidente, DNV) [email protected] Road

Section

Province

Budget (Million USD)

Tender

Source of funding

AU RN 188 San Nicolás - Junín

RN 0188

San Nicolás - Junín

Buenos Aires

16,8

03/07/2018

PPP

Paving

Paving RP 0008 Int. RN 12 - Int. RN 14

RP 0008

T-02: Int. RN 14 (Campo Grande) - Int. RN 12 (Jardín de América)

Misiones

26,7

01/08/2018

Treasury

Safe Roads

AU RN 5 Carlos Casares - Santa Rosa

RN 0005

Carlos Casares - Santa Rosa

Buenos Aires

14,1

03/08/2018

PPP

AU RN 16 Resistencia - RSP

RN 0016

T-03: Peaje Makallé - Int. RP 9

Chaco

32,0

03/10/2018

Tresuary

Safe Roads

Corridor NOA

RN 0009

Corridor NOA

Salta

8,4

03/10/2018

Toll

Safe Roads

Corridor NOA

RN 0009

Corridor NOA

Salta

7,2

03/10/2018

Toll

Safe Roads

AU RN 20 Caucete - San Juan

RN 0020

Acceso Este San Juan

San Juan

9,1

01/01/2019

Treasury

Safe Roads

AU RN 3 Azul - Bahía Blanca

RN 0003

Azul - Bahía Blanca

Buenos Aires

11,1

01/01/2019

PPP

Safe Roads

AU RN 9 Córdoba - Santiago del Estero

RN 0009

Córdoba - Santiago del Estero

Santiago del Estero

7,5

01/01/2019

Treasury

Safe Roads

AU RN 11 Santa Fe - Reconquista

RN 0011

Santa Fé - Reconquista

Santa Fé

15,0

01/01/2019

Treasury

Safe Roads

AU RN 11 Santa Fe - Reconquista

RN 0011

Santa Fé - Reconquista

Santa Fé

18,9

01/01/2019

Treasury

Safe Roads

AU RN 11 Santa Fe - Reconquista

RN 0011

Santa Fé - Reconquista

Santa Fé

15,0

01/01/2019

Treasury

Category

Safe Roads

Highway

Description

ROADS 182 future tenders 2017 - 2019 : 10,082 M USD Contact: Javier Iguacel (Presidente, DNV) [email protected] Category

Description

Road

Section

Province

Budget (Million USD)

Tender

Source of funding

Safe Roads

AU RN 11 Santa Fe - Reconquista

RN 0011

Santa Fé - Reconquista

Santa Fé

22,4

01/01/2019

Treasury

Safe Roads

AU RN 11 Santa Fe - Reconquista

RN 0011

Santa Fé - Reconquista

Santa Fé

25,0

01/01/2019

Treasury

Safe Roads

AU RN 11 Santa Fe - Reconquista

RN 0011

Santa Fé - Reconquista

Santa Fé

18,9

01/01/2019

Treasury

Safe Roads

Corridor Iberá

RN 0012

Corridor Iberá

Corrientes

12,2

01/01/2019

Treasury

Safe Roads

AU RN 12 Corrientes - Posadas

RN 0012

Corrientes - Posadas

Corrientes

9,6

01/01/2019

Treasury

Safe Roads

AU RN 22 Bahía Blanca - Chichinales

RN 0022

Bahía Blanca - Chichinales

Río Negro

3,6

01/01/2019

Treasury

Safe Roads

AU RN 33 Bahía Blanca - Pigüé

RN 0033

Bahía Blanca - Pigüé

Buenos Aires

9,9

01/01/2019

PPP

Highway

AU RN 34 Rosario - Sunchales

RN 0034

T-01: Int. RN A08 - Int. RN A012

Santa Fé

25,4

01/01/2019

Treasury

Road Corridor RN 40 Los Cipreses - Samoré

RN 0040

Futaleufú - Samoré

Río Negro

5,7

01/01/2019

Treasury

Repaving

Repaving RN 16 RSP - Salta

RN 0016

T-04: Quebrachal - Int. RN 9/34

Salta

12,0

01/04/2019

Treasury

Repaving

Repaving RN 16 RSP - Salta

RN 0016

T-04: Quebrachal - Int. RN 9/34

Salta

17,4

01/04/2019

Treasury

Road Corridor Resistencia - Corrientes

RN A030

Road Corridor Resistencia - Corrientes

Corrientes

24,0

01/07/2019

Treasury

Safe Roads

Safe Roads

TOTAL

USD 10,082 M

RAILWAYS

26 future tenders 2017: 891 M USD Contact: Guillermo Fiad (Presidente, ADIF) [email protected]

Category

Description

Tracks

Tracks renewal Suárez - Empalme Bancalari

Tracks

Tracks renewal Santa Fe

Signal and telecom

Adequacy telegraph line Korn - Mar del Plata

Province

Budget (Million USD)

Tender

Source of funding

Buenos Aires

23

may-17

Treasury

Santa Fe

14

may-17

CMEC

Buenos Aires

4

may-17

Treasury

Many

478

jun-17

CMEC

Tracks

Tracks renewal stage III Belgrano Cargas

Tracks

Tracks renewal Congreso - Tigre

Buenos Aires

32

jun-17

Treasury

New station Retiro

Buenos Aires

30

jun-17

Treasury

Tracks

Trancks renewal Glew - Alejandro Korn

Buenos Aires

10

jun-17

Treasury

Tracks

Railway crossing Mitre line

Buenos Aires

4

jun-17

Treasury

Station Castelar - Central Walk

Buenos Aires

2

jun-17

Treasury

Signal and telecom Once station

Buenos Aires

73

jul-17

Treasury

Many

13

jul-17

Treasury

Civil Works

Civil Works Signal and telecom Civil Works

Workshop San Martín line

Civil Works

Adequacy José C. Paz station - línea Mitre

Buenos Aires

6

jul-17

Treasury

Civil Works

Renovation Morón station - Sarmiento line

Buenos Aires

5

jul-17

Treasury

RAILWAYS

26 future tenders 2017: 891 M USD Contact: Guillermo Fiad (Presidente, ADIF) [email protected]

Category Civil Works Tracks Civil Works

Description Rehabilitation bridge Belgrano Cargas Tracks renewal Caroya section Low level crossing - Belgrano Sur line

Province

Budget (Million USD)

Tender

Source of funding

Many

4

jul-17

CAF

Córdoba

10

ago-17

Treasury

Buenos Aires

29

sep-17

Treasury

Santa Fe

23

sep-17

Treasury

Tracks

Tracks renewal Fournier section

Tracks

Integral adequacy Mar del Plata section

Buenos Aires

18

sep-17

Treasury

Change leads 815 Etapa II

Buenos Aires

13

sep-17

Treasury

Buenos Aires

2

sep-17

Treasury

Many

33

oct-17

Treasury

Tucumán

5

oct-17

Treasury

Electrification

Signal and telecom Tracks renewal Maldona - J. L Suárez Tracks

Tracks renewal Rufino - Bouchardo

Tracks

Tracks renewalTapia - Los Mogotes branch C Belgrano Cargas line

Tracks

Tracks expansion station Lavallol - Belgrano Cargas line

Buenos Aires

1

oct-17

CMEC

Tracks

Tracks renewal Tapiales - González Catán - Belgrano Sur line

Buenos Aires

15

nov-17

Treasury

Substitution swichtes 20 kv for 9 subestations

Buenos Aires

7

dic-17

Treasury

Many

7

ene-18

Treasury

Córdoba

30

feb-18

Treasury

Electrification Civil Works Tracks

Improvements in service station : Concordia, Timbues, San Cristobal, Monte Caseros, Guemes, Paso de los Libres, Garupá y Zarate Tracks renewal Bouchardo - Huinca Renanco

TOTAL

USD 891 M

PORTS 6 future tender: USD 109 M + USD 2,000 M

Contact: Manuela López Menéndez [email protected]

Description

Province

Budget (Million USD)

Tender

Source of funding

Concession Buenos Aires port

Buenos Aires City

2,000

TBC

PPP

Structure adaptation and access to the port

Entre Rios

1

jun-17

Treasury

Structure adaptation and access to the Quequen port

Buenos Aires

30

jul-17

Treasury

Construction of breakswaters to the Mar del Plata port

Buenos Aires

13

ago-17

Treasury

Construction of spring to the Bahía Blanca port

Buenos Aires

15

ago-17

Treasury

Adequacy spirng to La Plata port

Buenos Aires

50

dic-17

Treasury

TOTAL

USD 109 M + USD 2,000 M

AIRPORTS 62 future tenders 2017: 750 M USD

Contact: Patricio Di Stéfano (Presidente, ORSNA) [email protected] Airports Catamarca

Description Approximation light system (SALS)

Comodoro Rivadavia Renovation on runway and platform

Province

Budget (Million USD)

Tender

Source of funding

Catamarca

0,6

May-17

Direct Investments / trust

Chubut

9,3

May-17

Direct Investments / trust

Ezeiza

Electric repowering

Buenos Aires

1,3

May-17

Direct Investments / trust

Ezeiza

Resurfacing runway

Buenos Aires

9,4

May-17

Direct Investments / trust

Aeroparque

New post PAMPA - CHARLIE

Buenos Aires

1,2

May-17

Direct Investments / trust

Aeroparque

Energy and beacon system

Buenos Aires

1,6

May-17

Direct Investments / trust

Aeroparque

EDIFICIO VI - Upper floor renovation

Buenos Aires

0,6

May-17

Direct Investments / trust

New camara parking system

Buenos Aires

0,4

May-17

Direct Investments / trust

Aeroparque

EDIFICIO VII Y VIII - New passenger terminal (lower levels) - Equipment

Buenos Aires

9,3

May-17

Direct Investments / trust

Aeroparque

New commercial platform (North)

Buenos Aires

12,5

May-17

Direct Investments / trust

Bariloche

Health Area - National arrivals hall

Río Negro

0,3

May-17

Direct Investments / trust

Buenos Aires

1

May-17

Direct Investments / trust

Ezeiza

Ezeiza

Replacing the BRITE system with AGLAS

Río Grande

Renovations on runway

Tierra del Fuego

3,7

May-17

Direct Investments / trust

Catamarca

New passenger terminal

Catamarca

12,5

Jun-17

Direct Investments / trust

Chubut

3,1

Jun-17

Direct Investments / trust

Córdoba

1,5

Jun-17

Direct Investments / trust

Comodoro Rivadavia New beacon system (include UPS) Córdoba

Expansion of existing parking

AIRPORTS 62 future tenders 2017: 750 M USD

Contact: Patricio Di Stéfano (Presidente, ORSNA) [email protected] Felisa Blaquier (Comunicaciones, ORSNA) [email protected] Airports

Description

Province

Budget (Million USD)

Tender

Source of funding

Chubut

7,5

Jun-17

Direct Investments / trust

Esquel

Passennger terminal remodelations

Ezeiza

Beacon provition for taxiway

Buenos Aires

1,8

Jun-17

Direct Investments / trust

Ezeiza

Updating beacon system on movement area

Buenos Aires

9,3

Jun-17

Direct Investments / trust

Ezeiza

New medium voltage camara CHIVATOS

Buenos Aires

0,09

Jun-17

Direct Investments / trust

New beacon system CAT I - high intensity - turning basin, corrective work and demarcation

Formosa

3,1

Jun-17

Direct Investments / trust

Resurfacing runway

Misiones

9,3

Jun-17

Direct Investments / trust

Formosa

Iguazú Jujuy

Parking

Jujuy

3,1

Jun-17

Direct Investments / trust

Jujuy

Expansion of commercial platform

Jujuy

2,8

Jun-17

Direct Investments / trust

San Fernando

tubing of rainwater

Buenos Aires

0,02

Jun-17

Direct Investments / trust

San Fernando

New control tower

Buenos Aires

2,5

Jun-17

Direct Investments / trust

Renovations on runway and beacon system

San Juan

7,5

Jun-17

Direct Investments / trust

Approximation light system (SALS)

Mendoza

0,06

Jun-17

Direct Investments / trust

Tucumán

New terminal - TWR -Parking - Accesses

Tucumán

45

Jun-17

Direct Investments / trust

Tucumán

Expansion of commercial platform

Tucumán

5

Jun-17

Direct Investments / trust

Tucumán

ALS system (900 MTS)

Tucumán

1,2

Jun-17

Direct Investments / trust

Ezeiza

New hall B - EDIFICIO -

Buenos Aires

156

Jul-17

Direct Investments / trust

San Juan San Rafael

AIRPORTS 62 future tenders 2017: 750 M USD

Contact: Patricio Di Stéfano (Presidente, ORSNA) [email protected] Felisa Blaquier (Comunicaciones, ORSNA) [email protected] Airports

Description

Province

Budget (Million USD)

Tender

Source of funding

Ezeiza

New parking and outdoor spaces

Buenos Aires

25

Jul-17

Direct Investments / trust

Ezeiza

Renovation and lighting platform post Zulu (EX CAB. 05)

Buenos Aires

3,1

Jul-17

Direct Investments / trust

Ezeiza

Readjustment of lighting platform FBO Y Chivatos

Buenos Aires

0,07

Jul-17

Direct Investments / trust

Jujuy

New passenger terminal

Jujuy

28,1

Jul-17

Direct Investments / trust

Río Grande

New atmospheric discharges installation

Tierra del Fuego

0,02

Jul-17

Direct Investments / trust

San Juan

Expansion of commercial platform

San Juan

5

Jul-17

Direct Investments / trust

Comodoro Rivadavia

New passenger terminal - equipment

Chubut

4,6

Ago-17

Direct Investments / trust

Córdoba

Airport entrance station

Córdoba

2,5

Ago-17

Direct Investments / trust

Ezeiza

Renovation in pre-shipment area - Terminal A - Stage 2

Buenos Aires

5

Ago-17

Direct Investments / trust

Ezeiza

New passenger terminal - Ex estuche -

Buenos Aires

187,5

Ago-17

Direct Investments / trust

Ezeiza

Parking post signs in platform

Buenos Aires

0,03

Ago-17

Direct Investments / trust

Formosa

New passenger terminal

Formosa

12,5

Ago-17

Direct Investments / trust

Jujuy

New control tower

Jujuy

3,1

Ago-17

Direct Investments / trust

La Rioja

New passenger terminal

La Rioja

9,3

Ago-17

Direct Investments / trust

AIRPORTS 62 future tenders 2017: 750 M USD

Contact: Patricio Di Stéfano (Presidente, ORSNA) [email protected] Felisa Blaquier (Comunicaciones, ORSNA) [email protected] Airports

Description

Province

La Rioja

New beacon system category I- high intensity

La Rioja

Budget (Million USD) 2,8

Malargüe

Main renovation on terminal

Mendoza

Malargüe

Fissures repairing on runway 14-32 and taxiway

Mendoza

New water supply - southern area

San Juan San Juan Ezeiza

Tender

Source of funding

Ago-17

Direct Investments / trust

1,8

Ago-17

Direct Investments / trust

Mendoza

1,1

Ago-17

Direct Investments / trust

Mendoza

65,5

Ago-17

Direct Investments / trust

New passenger terminal

San Juan

23,7

Ago-17

Direct Investments / trust

New parking

San Juan

3,1

Ago-17

Direct Investments / trust

Renovation on arrivals area - Terminal A

Buenos Aires

9,3

Sept-17

Direct Investments / trust

Ezeiza

Renovation on runway 11-29

Buenos Aires

12,5

Sept-17

Direct Investments / trust

Ezeiza

New hall B - baggage system

Buenos Aires

8,3

Sept-17

Direct Investments / trust

Ezeiza

Buenos Aires

21,8

Sept-17

Direct Investments / trust

Misiones

12,5

Sept-17

Direct Investments / trust

Santa Rosa

Taxiway to header 35 Renovation on passenger terminal + telescoping walkway provision Frame, perimeter wall and perimeter fence

La Pampa

0,02

Sept-17

Direct Investments / trust

Posadas

Ezeiza

Resurfacing taxiway alfa, center line complete

Buenos Aires

2,1

Oct-17

Direct Investments / trust

Río Grande

Approximation light system (SALS)

Tierra del Fuego

1,3

Oct-17

Direct Investments / trust

Ezeiza

Leading electrical substation (P49) / medium voltage feeders

Buenos Aires

2

Nov-17

Direct Investments / trust

Iguazú

Parking

Misiones

3,1

Nov-17

Direct Investments / trust

TOTAL

USD 750 M

URBAN MOBILITY 12 future tenders 2017-2019: 5,798 M USD

Contact: Manuela López Menéndez (Secretaria de trabajos de transporte público) [email protected] Category

Description

Province

Budget (Million USD)

Tender

Source of funding

Electrification

Electrification San Martín line

Metropolitan Area of Buenos Aires

520

jun-17

Treasury

Signal and telecom

Signallling Roca line

Metropolitan Area of Buenos Aires

170

jun-17

BID

Tracks

Track renewal Roca line

Metropolitan Area of Buenos Aires

50

may-17

BID

Signal and telecom

Adequacy comunication Roca line

Metropolitan Area of Buenos Aires

200

jul-17

BID

RER

Construction Constitución station

Metropolitan Area of Buenos Aires

283

may-17

Treasury

RER

Construction Obelisco station

Metropolitan Area of Buenos Aires

877

jun-17

Treasury

Additional works

Adequacy work of Roca line

Metropolitan Area of Buenos Aires

25

ago-17

Treasury

RER

Interchanges

Metropolitan Area of Buenos Aires

385

2017

Treasury

RER

Construcción Correo Central Station

Metropolitan Area of Buenos Aires

485

2018

Treasury

RER

Connection Sarmiento line

Metropolitan Area of Buenos Aires

438

2018

Treasury

RER

Overpass San Martín line

Metropolitan Area of Buenos Aires

62

2018

Treasury

RER

Electrification Belgrano Sur line, Belgrano Norte line and Mitre line

Metropolitan Area of Buenos Aires

1,865

2018-2019

Treasury

TOTAL

USD 5,798 M