Status of the National Transport Plan and its impact on the development of the country
ROADS
FREIGHT RAILWAYS
CHALLENGES ACROSS THE TRANSPORT SECTOR
• •
PORTS AND WATERWAYS
• Limitations on
infrastructure don’t allow the operation of large ships. • Lack of access infrastructure. • Loss of competitiveness.
40% of the network in poor conditions 95% of freight transported by truck.
AIR SECTOR
• • •
Low domestic connectivity. Half the number of pax/capita than in the rest of the region. Space for improvements in safety and air traffic control.
• 5%
the total freight • Average speed: 14km/hour
URBAN MOBILITY
• • •
15M users in MRBA. Absence of public transport in the provinces Low quality infrastructure.
VISION Carrying out the most ambitious Transport Plan in the history of the country, with a federal vision; integrated and intermodal transport that provides conditions of excellence for the mobility of people and goods; reduces transportation times, costs and negative externalities; and fundamentally maximizes safety, comfort and sustainability.
STRATEGIC GOALS INFRASTRUCTURE Transforming, developing and modernizing the infrastructure for transport in the country, through a federal strategy, improving the
connectivity and productivity of the regional economies, especially the ones that have been most left behind. PRIORIZATION Managing in an efficient and sustainable way the different modes of transport, to contribute to the economic growth and to
reduce the logistic costs, defending the interests of users. Prioritizing the sustainable modes of transport and the individual non-motorized mobility.
SAFETY Positioning security as the center of actions associated with transportation in all its forms and in a transversal way to all the areas of the Ministry.
EMPLOYMENT AND PEOPLE Strengthening quality work, favoring the generation of direct and indirect employment in the execution of works; The creation of new jobs based on the opportunities generated by the development of infrastructure; and ongoing training to
professionalizing and prioritizing public and private employment in the field of transportation. TRANSPARENCY
Eliminating corruption and ensuring transparency in purchases, contracting and control of works, as well as in all acts of government of the Ministry of Transport.
INVESTMENT PLAN 2016 - 2019
USD 33,270 Public investment (million USD)
Private investment 2016-2019
TOTAL
2016
2017
2018
2019
Air sector
250
360
400
450
1,350
2,810
Freight railways
100
500
1,550
1,550
500
4,200
Urban transport
750
2,750
3,000
3,000
Roads
1,900
2,100
3,000
3,000
2,000
12,000
Ports
10
50
100
100
4,500
4,760
3,010
5,760
8,050
8,100
8,350
33,270
TOTAL
9,500
NATIONAL ROAD NETWORK Long term plan for 2027
USD 12,000 M INVESTMENT 2015 – 2019
RN 7 - Lujan a Giles
JOB GENERATION: 100,000
2,800 km new highways 2,500 km safe roads 13,000 km rehabilitated roads 2500new engineering projects 250 Km km new pavings 2,000 825 works
USD 35,000 M Roads
LONG TERM PLAN 2027
Highways
Safe roads
We have already achieved 50%
INTEGRATION WITH CHILE Investment USD 1,500 M
BINATIONAL TUNNEL AGUA NEGRA
It will go through the Andes Mountain linking the province of San Juan (Argentina) and Coquimbo Region (Chile). Two independent tunnels 14 km long at 4.080m above sea level. Main advantages: ▶ Developing a logistic corridor from Porto Alegre, Brasil, up to Coquimbo in Chile to strengthen regional economies, offering a straight exit to the Pacific Ocean. ▶ Contributing to the diversion of flows in the Cristo Redentor System during seasonal closure due to bad weather conditions. ▶ Generating jobs, developing technology and capacity that will strengthen Argentinean road engineering sector.
CRISTO REDENTOR SYSTEM
Investment USD 750 M
Main border crossing between Argentina-Chile, with more than 4,5 M tons/year.
Roads
Main mountain chain crossing in Latin America. Daily mean transit of 2.100 vehicles (20% of which are trucks) Executive project for the first stage is currently being developed together with IADB.
LARGE INFRASTRUCTURE PROJECTS SANTA FE – PARANÁ BRIDGE
Investment USD 1,100 M
Currently in pre-project development.
Public tender planned for the fourth quarter 2017. 4.5 km in longitude; 50 m height. Access lanes from road 168 y connectivity with roads 14, 12 and 11.
CORRIENTES – RESISTENCIA BRIDGE
Investment USD 750 M
Executive project contracted with UTE Consulbaires-Consular-IATASA. Public tender planned for the fourth quarter 2017.
Roads
3.5 km in longitude and 30 meters in height. Access lanes from roads RN 11 y RN 12.
ROAD CORRIDORS – PUBLIC PRIVATE PARTNERSHIP 6,576 km under the new concession scheme of national roads 11 projects to be tendered by 2017 2,000 M USD investment expected in the next 5 years. ► 7,000 km of resurfaced roads and new hard shoulders. ► 1,400 km of new highways on high volume corridors. 11 PPP in total: 8 corridors (between 600 and 900 Km extension) & 3 access to ports (Bahía Blanca and Rosario, and South access of Buenos Aires)
Roads
Income from toll & fixed fee guaranteed by the National Government in the first 7 years (funded by resources from a fuel fund established by law).
Planned schedule: ► Data room: 7-2017. ► Tender: end of 2017.
IMPACT ON ECONOMY: Road asphalt production 2017 is projected to be the best year in history (580,000 TN).
March 2017 was the best month in history: 53,466 tn. (The previous record was November 1998)
Consumption of road asphalt 1998-2017 580.000
404,834
555,836 486,547
492,029 480,805 472,728 468,101 460,474 459,256 435,056 427,537 414,356 406,280 404,428 357,107 329,438
352,291 328,322
211,017 132,137
Roads
1998
1999
2000
2001
2002
2003
Road asphalt 1998 - 2015
2004
Selling of asphaltic plants
175.166
2005
2006
2007
2008
2009
2010
2011
2012
Real consumption 2016 - actuality
2013
2014
2015
2016
2017
Projection 2017
2013/15: average 4 plants per year 2016: 32 plants 1st quarter 2017: 4 plants per month
WHERE ARE WE GOING: Freight network completely rehabilitated and 15% of freight transported by train in 2035
Network fully enabled
Freight trains
JOB GENERATION:
TOTAL INVESTMENT USD 15,000 M
25,000 DIRECT Tns transported Km rehabilitated tracks
Renewed track Heavy maintenance
WHAT DID WE RECEIVE? Declining freight railways The average commercial speed of Belgrano Cargas is 14 km/h. 45% of the tracks (4,000 km) with caution alert, which led to a significant drop in average speed. 1.5 derailments per day in the Belgrano Cargas network and 1.3 cuts on tracks (1st half 2016) Authorized speed on rails: 1984 vs. 2016 55
1984
41
Freight trains
28
2016
14
Córdoba
0
Dean Funes
* Primer semestre 2016
Recreo
Frías
La Madrid
Tucumán
IN A YEAR THE NEW MANAGEMENT REVERTED THE TREND
TN
We reverted the trend in Revertimos la tendencia 2016 with an annual en 2016 con growth of 3% un crecimiento del 3%
Freight trains
-17%
The Belgrano Line had its best December with 121,418 Tn
-17%
-24%
-20%
Operational action groups: Time reduction of 56% in derailing liftings
year 13
RENEWAL OF BELGRANO CARGAS LINE 20,600 employments (direct + indirect). ► ► ►
Freight trains
►
Renewal of 1,593 km 38 months Investment: USD 2,600 M Chinese funding CMEC + CAF + Treasury
RENEWAL OF SAN MARTÍN LINE Renewal of 1,626 km
39 months
Investment USD 2,800 M 5 Provinces (Buenos Aires, Santa Fe, Córdoba, San Luis and Mendoza)
+ 200 M USD/year of savings in logistics.
Reduction of road accidents and reduction of GHG emission.
EFFICIENCY
72% of local input.
The cost of transport will decrease by 55%, on average for the 12 M Tns that will be derived from truck to train.
EXTERNALITIES
The project will generate 26,000 jobs (direct + indirect)
LOGISTIC COSTS
EMPLOYMENT
Freight trains
Solution of a limitation to the competitiveness of the regional economy. Operational costs will be reduced significantly due to the decrease of rolling material weariness and derailings (in 2016 there were 91)
RENEWAL OF ROCA LINE – VACA MUERTA Recovery 700 km
36 months
Investment + USD 530 M
Funding PPP
1 Pto. Bahía Blanca 20 km/ 50 M USD
2 Improvement/Renewal B. Blanca – Chipolletti 540 km/ 300 M USD 3 Renewal Chipollelti - C. Cordero 30 km / 30 M USD
The only viable alternative for transporting this volume.
Reduction on logistics costs for the transport of potassium (Project Vale). Reduction of road accidents and reduction of emission of GHG.
EFFICIENCY
2019 1.5 M Tn 2023 5 M Tn 2028 7 M Tn
EXTERNALITIES
The 4 stages of the project will generate 3,500 jobs.
FREIGHT VOLUME
EMPLOYMENT
Freight trains
4 New layout C. Cordero – Añelo 85 km / 150 M USD Time optimization on transport and therefore a reduction on operational costs. Improvement on capacity of standard transport TN/axis.
WHAT ARE WE DOING? Recovering the freight network Never in history there was such an investment on the freight network infrastructure.
USD 6 billions investment on infrastructure BELGRANO CARGAS Today we have 800 km of rails being renewed. In April 2017 we will have:
1,593 km of rails being renewed. ► USD 2,600 M investment. ► 20,600 employment generated (direct + indirect).
Freight trains
►
ROCA
SAN MARTÍN In 2018 we will begin the construction:
We began to negotiate: 700 km of rails to renew. ► USD 530 M investment. ► 3,500 employment generated (direct + indirect). ►
1,626 km of rails to renew. ► USD 2,800 M investment. ► 26,000 employment generated (direct + indirect). ►
17
IMPACT ON THE ECONOMY: MORE PRODUCTION AND PRIVATE INVESTMENT in stock centers and loading facilities. Private investment as a complement of public investment : 12 companies will add 1.5M Tn of capacity to the network with a USD 113 M investment Four of these companies are already investing USD 33 M
Pampa del Infierno Ramal C12
Charata Ramal C3
USD 12M
USD 3.4 M
Pampa del Infierno Freight trains
Ramal C12
17%
Tucumán Ramal C8
USD 8.4M
USD 9M
IMPACT ON ECONOMY: GROWTH ON PRODUCTION AND TRANSPORT MODAL SHARE TRAIN 103 M TN
Freight trains
TRAIN 22 M TN
RIVER/SEA 12 M TN
ROAD CAMIÓN 617 410MMTN tn
ROAD 410 M TN
2012 435M tn
RIVER/SEA 22 M TN
2030 735M tn
WHERE ARE WE GOING: MULTIPLY WATER CARGO. Modern ports. Predictable and safe navigation. Improve industry competitiveness.
Develop our merchant navy and increase domestic use.
Increase dredging through publicprivate partnerships.
INVESTMENT 2016 - 2019
USD 260 M WORKS ► ►
Ports and waterways
Infrastructure works in ports and waterways (improve navigation safety).
+
CURRENT PRIVATE INVESTMENT USD 2,500 M
►
2 ports for 30 M USD under construction 4 Works to start for 84 M USD 3 projected works for 31 M USD
IMPROVEMENTS IN PORTS’ ACCESS Eliminating bottle necks and improving bypasses ROSARIO
Investment USD 657 M
Road works and new accesses to Rosario Port (267 km)
Toepfer – Pto. de San Martín – Santa Fe
Rail accesses to new ports. Reduction of transport and operational costs in ports.
BAHÍA BLANCA
Investment USD 557M
Highway construction in the intersection of National Roads 3 and 252 and part of the beltway in road 33 (corridor linking Bahia Blanca with Rosario) Three-level distributor over the Cholo Crossing, instead of the current roundabout at ground level.
BUENOS AIRES
Puerto de San Martín – Santa Fe
Investment USD 900 M
Roads
Construction of “Paseo del Bajo”: access to Buenos Aires Port Building 11 km of highway between provincial road 11 and Industrial Park (Tecplata).
21 Buenos Aires 9
BUENOS AIRES PORT EXPANSION The most important container terminals of Argentina can handle in total 1,5 million TEUs. Investment in the layout of the terminals in order to increase capacity and receive new generations ships (Post-Panamax).
Ports and waterways
Current concessions expire in 2019 and we expect the tender process to be launched during 2017. Investments are estimated in around 2,000 M USD –including access infrastructure in order to increase capacity of the port.
ARGENTINA HAS ONE OF THE MOST IMPORTANT GRAINS’ EXPORT NODE Ports of Rosario - Timbúes
Terminal 6 Is one of the biggest grain exporter terminal in the World.
74 M TNS OF GRAINS AND SUBPRODUCTS 25 TERMINALS 4,700 TRUCK/DAY
Ports of Quequén
Ports and waterways
Historic exports record: it grew 45% compared to 2015, 7,7 million of tons
Ports of Bahía Blanca - Rosales
10,5 M of tons of grains and subproducts Subsecretaría de Planificación de Transporte de Cargas y Logística
Historic record in 2016 of 12.2 million tons (50% growth versus 2015).
BUENOS AIRES METROPOLITAN REGION
22,000,000
Quality public transport
daily trips PUBLIC TRANSPORT
15 MILLION INHABITANTS 2,590 KM2
49 %
39 %
6%
4%
BUS RAPID TRANSIT SYSTEM IN ARGENTINA Buenos Aires Metropolitan Area Completed Juan B. Justo 9 de Julio Sur Norte
25 de Mayo San Martín La Matanza
Under construction Tres de Febrero Del Bajo (Alem) Projected
Quality public transport
Morón)
2,5 million daily users
USD 14,187 M INTEGRAL PLAN FOR METROPOLITAN PASSENGER TRAINS (2016-2025) Investments in progress USD 816M Automatic Trains Stops
Quality public transport
USD 570M Railway renewal USD 100M Powering USD 731M New stations and technologies USD 3,240M 100% new rolling stock
Strategic works in progress
USD 3,244M Regional Express Network
USD 3,000M Undergrounding
USD 1,360M
Viaducts and PBN
USD 933M Electrification
USD 193M Workshops
USD 5,650 M
USD 8,537 M
REGIONAL EXPRESS NETWORK A. DEL VALLE
STAGE 1: ROCA (7 kms)
Belgrano Norte Line
1
900,000 San Martín Line
1,300,000
SAN MARTIN
Period 2017 – 2019 | Investment: USD 283 M NUÑEZ
2 a b c
Mitre Line
1,500,000 COLEGIALES
RETIRO
3,600,000 SAN MARTIN
10,800,000
LA PATERNAL
PLAZA MISERERE
CENTRAL ROCA
STAGE 2: MITRE – SARMIENTO (6 kms) TOTAL BENEFITED POPULATION 1 Up to Correo Central.
CORREO CENTRAL
Period: 2018 – 2021 | Investment: USD 484 M
Sarmiento Line
1,700,000 Quality public transport
CONSTITUCION
OESTE
1,700,000
CENTRAL SARMIENTO
2
Connection Sarmiento. Period: 2018 - 2023 | Investment: USD 438 M
STAGE 3: BELGRANO (7 kms)
SUR
BELGRANO SOUTH /BELGRANO NORTH.
5,500,000
Period: 2020 – 2023 | Investment: USD 760 M
Belgrano Sur Line
1,500,000
Connection Roca Central Station up to La Paternal. up to Colegiales. up to Nuñez.
Period: 2017 – 2021 | Investment: USD 1262 M
NORTE CASEROS
Up to Constitución underground station.
Roca Line
4,000,000
STAGE 4: EXTENSIONS RER 1
SAN MARTIN up to Caseros. Period: 2017 - 2021
VILLA SOLDATI
2
MITRE up to San Martín. Period: 2017 - 2021
3 TAPIALES
BELGRANO Sur hasta Tapiales. Plazo de la obra: 2021 - 2023
RAILWAY VIADUCTS IN BUENOS AIRES
Quality public transport
MITRE TIGRE | 110 M USD 21 months – September 2019
TOTAL INVESTMENT
385 M USD
SAN MARTÍN| 140 M USD 28 months – July 2019
BELGRANO SUR| 135 M USD 28 months – October 2018
Work in progress
Work in progress
ELECTRIFICATIONS
Electrification Roca
Electrification San Martín
250 M USD
520 M USD 480 M USD
Electrification Belgrano Sur
Re-electrification Mitre
Electrification Belgrano Norte
783 M USD
602 M USD
Quality public transport
WORK IN PROGRESS
Electrification Roca line
SARMIENTO´S UNDERGROUNDING Invesments in progress
WORK IN PROGRESS
TOTAL INVESTMENT
Quality public transport
Actualizar ambas imágenes con avance de obra – mostrar el tunel
Elimination of 49 low level crossings 20,000 daily vehicles 180,000 daily passangers 25% travel time reduction
U$S 3,000 M
AUTOMATIC TRAIN STOP (ATS) Investing in safety
Contract granted to 300 million passengers per year 8 railway lines (Urquiza, Belgrano Norte, Belgrano Sur, Roca, Mitre, San Martín and Sarmiento)
Quality public transport
1,462 km of rail
WORK IN PROGRESS
260 M USD
FUTURE TENDER OF ROLLING STOCK – URBAN TRAINS ONE OF THE BIGGEST ROLLING STOCK TENDERS OF THE YEAR Detail Broad Gauge Electric Cars (1676/25Kv, 50Hz)
Numbers of Train
Quality public transport
Electric Train Maintanance
Units
Total
2017
2018
2019
2020
2021
2022
2023
2024
2025
USD M
1,806
6,24
6,24
41,6
95,68
166,4
182
310,96
540,8
459,08
Units
174
0
0
4
8
16
16
26
52
52
USD M
45,9
1,8
3,6
9
10,8
20,7
Units
51
2
4
10
12
23
0
0
0
0
3 DATA ROOM in January – 12 internacional companies – 485 business inquiries COMPANY
Financing conditions Lead time
ALSTOM
COUNTRY
COMPANY
COUNTRY
France
MITSUBISHI
Japan
TALGO
España
KBR
USA
BOMBARDIER
Germany
STADLER RAIL
Switzerland
SIEMENS
Germany
CAF
Spain
CRRC
China
TRANSMA HOLDING
Russia
HYUNDAI ROTEM
Korea
MARUBENI
Japan
AIR MARKET Doubling the number of domestic passengers Ezeiza’s airport today
Enhanced domestic and international connectivity
More routes and frequencies Airplane revolution
Ezeiza’s new airport
Additional safety
Better travel experience
NEW COMPANIES AVIANCA LOCAL INVESTMENT PLANS USD 220 millions 12 ATR – 600 + Embraer 190 450 direct jobs
Airplane revolution
NORWEGIAN LOCAL INVESTMENT PLANS USD 1.5-1.9 B 40 airplanes (approx. 27 purchase and 13 by leasing)
1,250 direct jobs
MODERNIZING AIRPORT INFRASTRUCTURE, INVESTMENT IN NEW TECHNOLOGY AND EQUIPMENT Aeroparque’s airport today
INVESMENT 2016 – 2019
1,400 M USD 3x the investment of the previous 4 years
Airplane revolution
New Aeroparque’s airport
19 airports
Iguazú
8 AIRPORTS ALREADY COMPLETED Córdoba Mendoza Río Gallegos Salta Trelew Iguazú Chapelco Tucumán
Trelew
Airplane revolution
Tucumán
Córdoba
Mendoza
9 AIRPORTS WORKS IN PROGRESS Comodoro Rivadavia Aeroparque Ezeiza Jujuy Salta San Fernando San Juan San Luis Bariloche
Comodoro Rivadavia
Airplane revolution
Ezeiza
Jujuy
Aeroparque
TRANSPARENCY - PROGRESS IN TENDERING PROCESSES Main actions: Online (web) publishing of all processes and documents, available openly and for free. Advance publication of general guidelines + Procedural Manual.
Mechanisms to avoid cartelization. Opening internal borders and tenders for international companies. New tendering strategies (lump-sum processes, possibility of improving offers) Adequacy of HR and internal processes. Adequacy of tender documents
Improvement in tendering processes times
Tenders 2017 Expected tender figures 2017 # TENDERS
BUDGET (USD)
Highways and roads
94
USD 6,687 M
Railways
27
USD 891 M
8
USD 2,510 M
62
USD 750 M
5
USD 109 M
196
USD 10,947 M
SECTOR
Urban Transport Airports Ports
TOTAL
ROADS 182 future tenders 2017 - 2019 : 10,082 M USD Contact: Javier Iguacel (Presidente, DNV)
[email protected] Category
Description
Road
Section
Province
Budget (Million USD)
Tender
Source of funding
Highway
NOA corridor
RN 9
T-04: Access to Tucumán
Tucumán
21
may-17
Treasury
Highway
NOA corridor
RN 9
T-04: Access to Tucumán
Tucumán
13
may-17
Treasury
Repaving
Paving RP 126 (Corrientes)
RP 126
T-01: Int. RN 14 - Curuzú Cuatiá
Corrientes
19
may-17
Treasury - CAF
Repaving
Paving RP 126 (Corrientes)
RP 126
T-02: Curuzú Cuatiá - Sauce
Corrientes
24
may-17
Treasury - BIRF
Paving
Paving RP 126 (Corrientes)
RP 126
T-03: Sauce - Int. RN 12
Corrientes
48
may-17
Treasury - N/S
Highway
AU RN 5 Luján - Carlos Casares
RN 5
T03: Mercedes - Suipacha
Buenos Aires
58
may-17
Treasury
Paving
Paving RP 40 Int. RN 123 - Int. RP 41
RP 40
Int. RN 123 - Int. RP 41
Corrientes
27
may-17
Treasury - BID
Highway
Rehabilitation and access to Barranqueras
RN 16
Distribuidor Acceso a Barranqueras
Corrientes Chaco
9
may-17
Treasury
Repaving
Rehabilitation and access a Barranqueras
RN 16
Rehabilitation of road accesso to Barranqueras.
Chaco
5
may-17
CAF
Others
Rehabilitation and access a Barranqueras
Many
Parking for trucks
Chaco
4
may-17
CAF
Repaving
Corridor NOA
RN 66
Int. RN 9 - Int. RN 34
Jujuy
23
may-17
Treasury
Recovery and maintenance
Crema MALLA 104
RN 152 / RN 143
Int. RN35 - Chacharramendi
La Pampa
24
may-17
Treasury
ROADS 182 future tenders 2017 - 2019 : 10,082 M USD Contact: Javier Iguacel (Presidente, DNV)
[email protected] Category
Description
Road
Section
Province
Budget Tender (Million USD)
Source of funding
Recovery and maintenance
Crema MALLA 408a
RN 60 / RN 157
T-01: Lte. Cordoba -Emp.Rn157 ; T-02: Int. RN60 Frias
Catamarca
24
may-17
Treasury
Recovery and maintenance
Crema MALLA 408d
RN 157
Acc. Frías - Int. RP329
Tucumán
24
may-17
Treasury
RN 3
T-03: Variante a S. M. Monte
Buenos Aires
49
may-17
Treasury
RN 237/RN 234
T-01: Int. RP 27 - Pte A° Limay Chico ; T-02: Int. RN 40 - Int. RN 237
Neuquén
27
may-17
Treasury
Highway Recovery and maintenance
Highway Cañuelas - Olavarría Crema MALLA 131
Highway
AU RN 95 urban road Saenz Peña
RN 95
Calle 251 (km 1109,4) - Calle 351 (km 1115,7)
Chaco
12
may-17
CAF
Highway
AU RN 40 Mendoza - San Juan
RN 40
T01: Acc. Aeropuerto El Plumerillo - Lte. Me/SJ
Mendoza
178
may-17
Treasury
Highway
AU RN 33 Rufino - Rosario
RN 33
T-04: Cnia. Las Flores - Pérez
Santa Fé
153
may-17
Treasury
Safe Roads
AU RN 158 San Francisco - Río Cuarto
RN 58
San Francisco - Río Cuarto
Córdoba
86
may-17
Treasury
Safe Roads
AU RN 158 San Francisco - Río Cuarto
RN 158
San Francisco - Río Cuarto
Córdoba
90
may-17
Treasury
Highway
AU RN 20 Caucete - San Juan
RN 20
Caucete - San Juan
San Juan
50
may-17
Treasury
Repaving
Reconstruction RN 152 Gral. Acha Puelches
RN 152
Gral. Acha – Puelches
La Pampa
33
jun-17
Treasury
Corredor RN 3 Tierra del Fuego
RN 3
Corredor Tierra del Fuego
Tierra del Fuego
29
jun-17
Treasury
Safe Roads RN 11 Formosa - Clorinda
RN 11
T-05: Circunvalación a Formosa
Formosa
33
jun-17
Treasury
Safe Roads
Highway
ROADS 182 future tenders 2017 - 2019 : 10,082 M USD Contact: Javier Iguacel (Presidente, DNV)
[email protected] Category Highway
Description AU RN 8 Pergamino - Venado
Budget Tender (Million USD)
Source of funding
Road
Section
Province
RN 8
Variant Venado Tuerto
Santa Fé
38
jul-17
Treasury
RN 0259
T-01: Futaleufú - Int. RN 40
Chubut
4
jul-17
Treasury
Paving
Road Corridor RN 40 Los Cipreses - Samoré
Paving
Safe Roads RN 40 San Juan - SJ Jáchal
RN 40
T-02: Talacasto - Int. RN 150
San Juan
54
jul-17
Treasury
Paving
New RN 151 Neuquén - Dique Ballester
RN 151
T-07: Int. RP 7 - Int. RN 1V22
Neuquén
13
jul-17
Treasury
Highway
Corridor NOA
RN 34
T-06: Rosario de la Frontera - Acc. A Salta
Salta
75
jul-17
Treasury
Special Work
Corridor NOA
RN 34
T-06: Rosario de la Frontera - Acc. A Salta
Salta
89
jul-17
Treasury
Special Work
Corridor NOA
RN 34
T-06: Rosario de la Frontera - Acc. A Salta
Salta
89
jul-17
Treasury
Reconstruction RN 149 Calingasta - Las Flores
RN 149
T-02: Calingasta - Iglesia
San Juan
35
ago-17
Treasury
Paving RN 149 Uspallata - Barreal
RN 149
T-01: Uspallata - Calingasta
Mendoza
21
ago-17
Treasury
Ruta Nueva Paving Highway
NOA Corridor
RN 9
T-03: Termas de R° Hondo - Tucumán
Tucumán
126
ago-17
Treasury
Highway
NOA Corridor
RN 9
T-03: Termas de R° Hondo - Tucumán
Tucumán
84
ago-17
Treasury
Highway
NOA Corridor
RN 34
T-07: Acc. A Salta - San Pedro de Jujuy
Salta
44
ago-17
Treasury
Highway
AU RN 33 Rufino - Rosario
RN 33
T-02: San Eduardo - Chovet
Santa Fé
204
sep-17
Treasury
ROADS 182 future tenders 2017 - 2019 : 10,082 M USD Contact: Javier Iguacel (Presidente, DNV)
[email protected] Category
Description
Road
Section
Province
Budget(Milli on USD)
Tender
Source of funding
Highway
AU RN 34 Rosario - Sunchales
RN 34
T-03: San Genaro - Cañada Rosquín
Santa Fé
122
sep-17
Treasury
Highway
AU RN 34 Rosario - Sunchales
RN 34
T-04: Cañada Rosquín - Int. RN 19
Santa Fé
134
sep-17
Treasury
Paving National Road N° 78 - Tramo: Chilecito - Tinogasta - Sección
RN 78
Chilecito - Tinogasta
La Rioja, Catamarca
7
sep-17
Treasury
Cerma MALLA 204
RN 9
Villa del Totoral - Lte. Santiago del Estero
Córdoba
17
sep-17
Treasury
Cerma MALLA 504
RN 14
Lte. Corrientes - Campo Grande
Misiones
23
sep-17
Treasury
Cerma MALLA 539
RN 14
Campo Grande - Int. RP 20
Misiones
23
sep-17
Treasury
AU RN 5 Carlos Casares - Santa Rosa
RN 5
Anguil - Int. RN 35
La Pampa
80
sep-17
Treasury
Santa Fe
65
oct-17
Treasury
Paving Recovery and maintenance Recovery and maintenance Recovery and maintenance Highway Special Work
Access to Ports of Rosario
RM VARIAS Accesos a Terminales de Timbués y San Martín
Safe Roads
AU RN 14 Libres - Posadas
RN 14
Paso de los Libres - Posadas
Corrientes
26
oct-17
Treasury
Safe Roads
Safe Roads RN 14 San José - San Vicente
RN 14
San José - San Vicente
Misiones
30
oct-17
Treasury
Safe Roads
Safe Roads RN 14 San José - San Vicente
RN 14
San José - San Vicente
Misiones
32
oct-17
Treasury
Safe Roads
Safe Roads RN 14 San José - San Vicente
RN 14
San José - San Vicente
Misiones
31
oct-17
Treasury
Safe Roads
AU RN 34 Sunchales - Taboada
RN 34
Sunchales - Taboada
32
oct-17
Treasury
Safe Roads
AU RN 34 Sunchales - Taboada
RN 34
Sunchales - Taboada
21
oct-17
Treasury
Santiago del Estero Santiago del Estero
ROADS 182 future tenders 2017 - 2019 : 10,082 M USD Contact: Javier Iguacel (Presidente, DNV)
[email protected] Category Safe Roads
Description AU RN 34 Sunchales - Taboada
Road
Section
Province
Budget (Million USD)
Tender
Source of funding
RN 34
Sunchales - Taboada
Santiago del Estero
30
oct-17
Tresuary
Highway
Access to Ports of Rosario
RN A12
Int. RN 9 (a Bue) - Int. RN 11
Santa Fé
120
sep-17
Treasury
Highway
Access to Ports of Rosario
RN A12
Int. RN 9 (a Bue) - Int. RN 11
Santa Fé
75
sep-17
Treasury
Highway
Access to Ports of Bahía Blanca
RN 3
T-01: Paso Urbano por Bahía Blanca
Buenos Aires
49
oct-17
PPP
Highway
AU RN 205 Cañuelas - Saladillo
RN 205
T-01: Cañuelas - Lobos
Buenos Aires
108
oct-17
PPP
Highway
AU Cañuelas - Olavarría
RN 3
T-05: Las Flores - Azul
Buenos Aires
110
oct-17
PPP
Highway
AU Cañuelas - Olavarría
RN 3
T-05: Las Flores - Azul
Buenos Aires
140
oct-17
PPP
National Road N° 9 - Acceso Parque industrial y puertos de Zárate
RN 9
Access to industrial park and Zarate ports
Buenos Aires
7
oct-17
PPP
Highway
AU RN 5 Luján - Carlos Casares
RN 5
T04: Suipacha - Chivilcoy
Buenos Aires
70
oct-17
PPP
Highway
AU Cañuelas - Olavarría
RN 3
T-04: S. M. Monte - Las Flores
Buenos Aires
65
oct-17
PPP
Highway
AU Cañuelas - Olavarría
RN 3
T-04: S. M. Monte - Las Flores
Buenos Aires
99
oct-17
PPP
Highway
AU RN 33 Bahía Blanca - Pigüé
RN 33
T-02: Bahía Blanca - Pigüé
Buenos Aires
90
oct-17
PPP
Special Work
ROADS 182 future tenders 2017 - 2019 : 10,082 M USD Contact: Javier Iguacel (Presidente, DNV)
[email protected] Category
Description
Road
Section
Province
Budget (Million USD)
Tender
Source of funding
Special Work
Cristo Redentor System
RN 7
T03: Potrerillos - Uspallata
Mendoza
60
oct-17
PPP
Special Work
Cristo Redentor System
RN 7
T05: Uspallata - Acc. Tunel Libertadores
Mendoza
100
oct-17
PPP
Highway
AU RN 3 Azul - Bahía Blanca
RN 3
T-03: Dorrego - Bahía Blanca
Buenos Aires
103
oct-17
PPP
Highway
AU RN 3 Azul - Bahía Blanca
RN 3
T-03: Dorrego - Bahía Blanca
Buenos Aires
90
oct-17
PPP
Safe Roads
AU RN 34 La Banda - Rosario de la Frontera
RN 34
La Banda - Rosario de la Frontera
Santiago del Estero
32
oct-17
Treasury
Safe Roads
AU RN 34 La Banda - Rosario de la Frontera
RN 34
La Banda - Rosario de la Frontera
Salta
22
oct-17
Treasury
AU RN 22 Cipoletti - Zapala
RN 22
T-02: Cipoletti - Neuquén
Neuquén
100
oct-17
Treasury
NOA Corridor
RN 34
T-01: Taboada - La Banda
Santiago del Estero
181
oct-17
Treasury
AU Cañuelas - Olavarría
RN 226
T-06: Azul - Olavarría
Buenos Aires
29
oct-17
PPP
RN 3
Azul - Bahía Blanca
Buenos Aires
12
oct-17
PPP
RN 5
Carlos Casares - Santa Rosa
Buenos Aires
9
oct-17
PPP
RN 5
Carlos Casares - Santa Rosa
La Pampa
14
oct-17
Treasury
Special Work Highway Special Work Safe Roads Safe Roads
Safe Roads
AU RN 3 Azul - Bahía Blanca AU RN 5 Carlos Casares - Santa Rosa AU RN 5 Carlos Casares - Santa Rosa
ROADS 182 future tenders 2017 - 2019 : 10,082 M USD Contact: Javier Iguacel (Presidente, DNV)
[email protected] Category
Description
Safe Roads Safe Roads RN 38 La Rioja - Alberdi
Road
Section
Province
Budget (Million USD)
Tender
Source of funding
RN 38
La Rioja - Alberdi
Tucumán
34
oct-17
Treasury
Highway
AU RN 11 Resistencia - Formosa
RN 11
T-02: Resistencia - Int. RP 90
Chaco
36
nov-17
Treasury
Highway
AU RN 33 Rufino - Rosario
RN 33
T-05: Pérez - Int. RN A008
Santa Fé
27
nov-17
Treasury
Safe Roads AU RN 5 Carlos Casares - Santa Rosa
RN 5
Carlos Casares - Santa Rosa
Buenos Aires
24
nov-17
PPP
Safe Roads Corridor Iberá
RN 12
Corredor del Iberá
Corrientes
24
nov-17
Treasury
RN 12
Corrientes - Posadas
Corrientes
72
dic-17
Treasury
Safe Roads AU RN 9 Córdoba - Santiago del Estero
RN 9
Córdoba - Santiago del Estero
Córdoba
22
dic-17
Treasury
Safe Roads AU RN 9 Córdoba - Santiago del Estero
RN 9
Córdoba - Santiago del Estero
Santiago del Estero
23
dic-17
Treasury
Safe Roads AU RN 9 Córdoba - Santiago del Estero
RN 9
Córdoba - Santiago del Estero
Santiago del Estero
29
dic-17
Treasury
RePaving RN 16 RSP - Salta
RN 16
T-02: Lte. Cha/Sgo - Lte. Sgo/Cha
Santiago del Estero
22
dic-17
Treasury
Road connection to Resistencia bridge and Corrientes capital
Many
New bridge Resistencia - Corrientes
Corrientes - Chaco
900
dic-17
PPP
Highway
Repaving Special work
AU RN 12 Corrientes - Posadas
ROADS 182 future tenders 2017 - 2019 : 10,082 M USD Contact: Javier Iguacel (Presidente, DNV)
[email protected]
Description
Road
Section
Province
Budget (Million USD)
Tender
Source of funding
Special Wok Bridge Santo Tomé - Santa Fe
RN 11
Conexión Vial Santa Fe - Santo Tomé
Santa Fé
140,0
01/01/2018
TBC
RN 1V11
Int. RN A012 - Int. AP 01
Santa Fé
117,0
01/01/2018
Treasury
RN 3
T-01: Paso Urbano por Bahía Blanca
Buenos Aires
71,5
01/01/2018
PPP
RN 0252
T-01: Paso Urbano por Bahía Blanca
Buenos Aires
84
01/01/2018
PPP
RN A005
Int. RN 8 - Int. RN 36
Córdoba
51,6
01/01/2018
Treasury
RN 12
Corrientes - Posadas
Corrientes
21,3
01/01/2018
Treasury
RP 1
T-08: San Pedro - Pichanal
Jujuy
31,2
01/01/2018
Tresury - BID
Special Wok Cristo Redentor System
RN 7
T06: Adecuación de Túnel Libertador y Caracoles
Mendoza
200
01/01/2018
PPP
Safe Roads AU RN 11 Santa Fe - Reconquista
RN 11
Santa Fé - Reconquista
Chaco
21,1
31/01/2018
Treasury
Safe Roads AU RN 14 Libres - Posadas
RN 14
Paso de los Libres - Posadas
Corrientes
30,6
31/01/2018
Treasury
Safe Roads AU RN 35 Realicó - Río Cuarto
RN 35
Realicó - Río Cuarto
Córdoba
37,5
31/01/2018
Treasury
RN A030
Road Corridor Resistencia - Corrientes
Chaco
20
31/01/2018
Treasury
Category
Special Wok Access to Ports of Rosario Highway
Access to Ports of Bahía Blanca
Special Wok Access to Ports of Bahía Blanca Highway
AU RN A005 Circunvalación Río Cuarto
Safe Roads AU RN 12 Corrientes - Posadas Repaving
Repaving RP 1 Jujuy
Safe Roads Road Corridor Resistencia - Corrientes
ROADS 182 future tenders 2017 - 2019 : 10,082 M USD Contact: Javier Iguacel (Presidente, DNV)
[email protected] Category
Description
Safe Roads
AU RN 3 Azul - Bahía Blanca
Safe Roads
AU RN 9 Córdoba - Santiago del Estero
Safe Roads
AU RN 22 Bahía Blanca - Chichinales
Safe Roads
AU RN 22 Bahía Blanca - Chichinales
Safe Roads
AU RN 34 Sunchales - Taboada
Safe Roads
AU RN 34 Sunchales - Taboada
Safe Roads
Safe Roads RN 127 Paraná - RN 14
Safe Roads
Safe Roads RN 127 Paraná - RN 14
Safe Roads
Safe Roads RN 127 Paraná - RN 14
Safe Roads
Safe Roads RN 127 Paraná - RN 14
Highway
AU RN 117 Santa Tomé - Libres
Safe Roads
AU RN 8 Río Cuarto - Villa Mercedes
Safe Roads
AU RN 8 Río Cuarto - Villa Mercedes
Safe Roads
AU RN 22 Bahía Blanca - Chichinales
Road
Section
Province
Budget (Million USD)
Tender
Source of funding
RN 3
Azul - Bahía Blanca
Buenos Aires
20,7
31/01/2018
PPP
RN 9
Córdoba - Santiago del Estero
Córdoba
21
31/01/2018
Treasury
RN 22
Bahía Blanca - Chichinales
Río Negro
21
31/01/2018
Treasury
RN 22
Bahía Blanca - Chichinales
Río Negro
11,4
31/01/2018
Treasury
RN 34
Sunchales - Taboada
Santa Fé
18
31/01/2018
Treasury
RN 34
Sunchales - Taboada
Santa Fé
21
31/01/2018
Treasury
RN 0127
Paraná - RN 14
Entre Ríos
22,5
31/01/2018
Treasury
RN 0127
Paraná - RN 14
Entre Ríos
19,2
31/01/2018
Treasury
RN 0127
Paraná - RN 14
Entre Ríos
24,9
31/01/2018
Treasury
RN 0127
Paraná - RN 14
Corrientes
12
31/01/2018
Treasury
RN 0117
Int. RN 14 - Paso Intl. Libres
Corrientes
6,7
01/02/2018
Toll
RN 8
Río Cuarto - Villa Mercedes
Córdoba
22,5
03/03/2018
Treasury
RN 8
Río Cuarto - Villa Mercedes
San Luis
9,0
03/03/2018
Treasury
RN 22
Bahía Blanca - Chichinales
Buenos Aires
21,9
03/03/2018
PPP
49
ROADS 182 future tenders 2017 - 2019 : 10,082 M USD Contact: Javier Iguacel (Presidente, DNV)
[email protected] Category
Description
Road
Section
Province
Budget (Million USD)
Tender
Source of funding
Safe Roads
AU RN 22 Bahía Blanca - Chichinales
RN 0022
Bahía Blanca - Chichinales
La Pampa
18,6
03/03/2018
Treasury
Safe Roads
AU RN 22 Bahía Blanca - Chichinales
RN 0022
Bahía Blanca - Chichinales
Río Negro
9,6
03/03/2018
Treasury
Safe Roads
AU RN 22 Bahía Blanca - Chichinales
RN 0022
Bahía Blanca - Chichinales
Río Negro
3,3
03/03/2018
Treasury
AU RN 34 Rosario - Sunchales
RN 0034
T-02: Int. RN A012 - San Genaro
Santa Fé
57,0
01/04/2018
Treasury
Safe Roads
Corridor Iberá
RN 0123
Corridor Iberá
Corrientes
16,6
02/04/2018
Treasury
Safe Roads
Safe Roads RN 174 Rosario - Villaguay
RN 0174
Rosario - Villaguay
Entre Ríos
17,4
02/04/2018
Treasury
Safe Roads
AU RN 11 Santa Fe - Reconquista
RN 0011
Santa Fé - Reconquista
Santa Fé
64,5
02/04/2018
Treasury
Safe Roads
AU RN 11 Santa Fe - Reconquista
RN 0011
Santa Fé - Reconquista
Santa Fé
60,0
02/04/2018
Treasury
Safe Roads
Safe Roads RN 14 San José - San Vicente
RN 0014
San José - San Vicente
Misiones
18,0
02/04/2018
Treasury
Safe Roads
Corridor NOA
RN 0065
Corridor NOA
Santiago del Estero
49,0
02/04/2018
Treasury
Safe Roads
Safe Roads RN 237 R° Collón Curá Bariloche
RN 0237
R° Collón Curá - Bariloche
Neuquén
13,3
02/04/2018
Treasury
Safe Roads
Safe Roads RN 237 R° Collón Curá Bariloche
RN 0237
R° Collón Curá - Bariloche
Neuquén
13,3
02/04/2018
Treasury
Special Wok
Access to Ports of Rosario
RP 0010
Int. RN A012 - Int. AP 01
Santa Fé
7,5
02/04/2018
Treasury
Repaving RN 16 RSP - Salta
RN 0016
T-02: Lte. Cha/Sgo - Lte. Sgo/Cha
Santiago del Estero
17,3
01/05/2018
Treasury
Highway
Repaving
ROADS 182 future tenders 2017 - 2019 : 10,082 M USD Contact: Javier Iguacel (Presidente, DNV)
[email protected] Road
Section
Province
Budget (Million USD)
Tender
Source of funding
Repaving RN 16 RSP - Salta
RN 0016
T-02: Lte. Cha/Sgo - Lte. Sgo/Cha
Santiago del Estero
13,8
01/05/2018
Treasury
Safe Roads
AU RN 33 Bahía Blanca - Pigüé
RN 0033
Bahía Blanca - Pigüé
Buenos Aires
18,6
03/05/2018
PPP
Safe Roads
AU RN 32 Pergamino - Rosario
RN 0032
Pergamino - Rosario
Buenos Aires
14,4
03/05/2018
PPP
Safe Roads
AU RN 32 Pergamino - Rosario
RN 0032
Pergamino - Rosario
Santa Fé
17,4
03/05/2018
Treasury
Highway
Repav Au 7 San Luis
RN 0007
Variante Desaguadero
Mendoza
30,0
01/06/2018
Treasury
Highway
AU RN 229 Bahía Blanca - Punta Alta
RN 0229
T-03: Dorrego - Bahía Blanca
Buenos Aires
25,9
03/06/2018
PPP
Safe Roads
AU RN 3 Azul - Bahía Blanca
RN 0003
Azul - Bahía Blanca
Buenos Aires
15,9
03/06/2018
PPP
Special Wok
Cristo Redentor System
RN 0007
T04: Variante Uspallata
Mendoza
25,0
01/07/2018
PPP
Special Wok
Road Corridor Resistencia - Corrientes
RN A030 T-02: Segundo Bridge Resistencia - Corrientes Chaco - Corrientes
600,0
01/07/2018
Treasury
Special Wok
Access to Ports of Rosario
RP 0091
Int. RN A012 - Int. AP 01
Santa Fé
17,5
01/07/2018
Treasury
Special Wok
Vial Integration Santa Fe - Paraná
RN A007
T-02: Bridge SF-Paraná
Santa Fé-Entre Ríos
500,0
01/07/2018
Treasury
Category
Repaving
Description
ROADS 182 future tenders 2017 - 2019 : 10,082 M USD Contact: Javier Iguacel (Presidente, DNV)
[email protected] Road
Section
Province
Budget (Million USD)
Tender
Source of funding
Safe Roads Vial Integration Santa Fe - Paraná
RN A007
Vial Integration Santa Fe - Paraná
Entre Ríos
14,0
01/07/2018
Treasury
Safe Roads AU RN 3 Azul - Bahía Blanca
RN 0003
Azul - Bahía Blanca
Buenos Aires
15,0
03/07/2018
PPP
Safe Roads AU RN 5 Carlos Casares - Santa Rosa
RN 0005
Carlos Casares - Santa Rosa
Buenos Aires
15,3
03/07/2018
PPP
Safe Roads Corridor NOA
RN 0009
Corridor NOA
Tucumán
13,8
03/07/2018
Toll
Safe Roads Corridor NOA
RN 0009
Corridor NOA
Tucumán
15,0
03/07/2018
Toll
Safe Roads Safe Roads RN 33 Pigüé - Rufino
RN 0033
Pigüé - Rufino
Buenos Aires
18,3
03/07/2018
PPP
Safe Roads Safe Roads RN 33 Pigüé - Rufino
RN 0033
Pigüé - Rufino
Buenos Aires
18,0
03/07/2018
PPP
Safe Roads Safe Roads RN 33 Pigüé - Rufino
RN 0033
Pigüé - Rufino
Buenos Aires
19,2
03/07/2018
PPP
Safe Roads Safe Roads RN 33 Pigüé - Rufino
RN 0033
Pigüé - Rufino
Buenos Aires
19,5
03/07/2018
PPP
Safe Roads Safe Roads RN 33 Pigüé - Rufino
RN 0033
Pigüé - Rufino
Buenos Aires
15,0
03/07/2018
PPP
Safe Roads Safe Roads RN 33 Pigüé - Rufino
RN 0033
Pigüé - Rufino
Buenos Aires
15,6
03/07/2018
PPP
Safe Roads Safe Roads RN 33 Pigüé - Rufino
RN 0033
Pigüé - Rufino
Buenos Aires
15,0
03/07/2018
PPP
Safe Roads AU RN 188 San Nicolás - Junín
RN 0188
San Nicolás - Junín
Buenos Aires
11,4
03/07/2018
PPP
Category
Description
ROADS 182 future tenders 2017 - 2019 : 10,082 M USD Contact: Javier Iguacel (Presidente, DNV)
[email protected] Road
Section
Province
Budget (Million USD)
Tender
Source of funding
AU RN 188 San Nicolás - Junín
RN 0188
San Nicolás - Junín
Buenos Aires
16,8
03/07/2018
PPP
Paving
Paving RP 0008 Int. RN 12 - Int. RN 14
RP 0008
T-02: Int. RN 14 (Campo Grande) - Int. RN 12 (Jardín de América)
Misiones
26,7
01/08/2018
Treasury
Safe Roads
AU RN 5 Carlos Casares - Santa Rosa
RN 0005
Carlos Casares - Santa Rosa
Buenos Aires
14,1
03/08/2018
PPP
AU RN 16 Resistencia - RSP
RN 0016
T-03: Peaje Makallé - Int. RP 9
Chaco
32,0
03/10/2018
Tresuary
Safe Roads
Corridor NOA
RN 0009
Corridor NOA
Salta
8,4
03/10/2018
Toll
Safe Roads
Corridor NOA
RN 0009
Corridor NOA
Salta
7,2
03/10/2018
Toll
Safe Roads
AU RN 20 Caucete - San Juan
RN 0020
Acceso Este San Juan
San Juan
9,1
01/01/2019
Treasury
Safe Roads
AU RN 3 Azul - Bahía Blanca
RN 0003
Azul - Bahía Blanca
Buenos Aires
11,1
01/01/2019
PPP
Safe Roads
AU RN 9 Córdoba - Santiago del Estero
RN 0009
Córdoba - Santiago del Estero
Santiago del Estero
7,5
01/01/2019
Treasury
Safe Roads
AU RN 11 Santa Fe - Reconquista
RN 0011
Santa Fé - Reconquista
Santa Fé
15,0
01/01/2019
Treasury
Safe Roads
AU RN 11 Santa Fe - Reconquista
RN 0011
Santa Fé - Reconquista
Santa Fé
18,9
01/01/2019
Treasury
Safe Roads
AU RN 11 Santa Fe - Reconquista
RN 0011
Santa Fé - Reconquista
Santa Fé
15,0
01/01/2019
Treasury
Category
Safe Roads
Highway
Description
ROADS 182 future tenders 2017 - 2019 : 10,082 M USD Contact: Javier Iguacel (Presidente, DNV)
[email protected] Category
Description
Road
Section
Province
Budget (Million USD)
Tender
Source of funding
Safe Roads
AU RN 11 Santa Fe - Reconquista
RN 0011
Santa Fé - Reconquista
Santa Fé
22,4
01/01/2019
Treasury
Safe Roads
AU RN 11 Santa Fe - Reconquista
RN 0011
Santa Fé - Reconquista
Santa Fé
25,0
01/01/2019
Treasury
Safe Roads
AU RN 11 Santa Fe - Reconquista
RN 0011
Santa Fé - Reconquista
Santa Fé
18,9
01/01/2019
Treasury
Safe Roads
Corridor Iberá
RN 0012
Corridor Iberá
Corrientes
12,2
01/01/2019
Treasury
Safe Roads
AU RN 12 Corrientes - Posadas
RN 0012
Corrientes - Posadas
Corrientes
9,6
01/01/2019
Treasury
Safe Roads
AU RN 22 Bahía Blanca - Chichinales
RN 0022
Bahía Blanca - Chichinales
Río Negro
3,6
01/01/2019
Treasury
Safe Roads
AU RN 33 Bahía Blanca - Pigüé
RN 0033
Bahía Blanca - Pigüé
Buenos Aires
9,9
01/01/2019
PPP
Highway
AU RN 34 Rosario - Sunchales
RN 0034
T-01: Int. RN A08 - Int. RN A012
Santa Fé
25,4
01/01/2019
Treasury
Road Corridor RN 40 Los Cipreses - Samoré
RN 0040
Futaleufú - Samoré
Río Negro
5,7
01/01/2019
Treasury
Repaving
Repaving RN 16 RSP - Salta
RN 0016
T-04: Quebrachal - Int. RN 9/34
Salta
12,0
01/04/2019
Treasury
Repaving
Repaving RN 16 RSP - Salta
RN 0016
T-04: Quebrachal - Int. RN 9/34
Salta
17,4
01/04/2019
Treasury
Road Corridor Resistencia - Corrientes
RN A030
Road Corridor Resistencia - Corrientes
Corrientes
24,0
01/07/2019
Treasury
Safe Roads
Safe Roads
TOTAL
USD 10,082 M
RAILWAYS
26 future tenders 2017: 891 M USD Contact: Guillermo Fiad (Presidente, ADIF)
[email protected]
Category
Description
Tracks
Tracks renewal Suárez - Empalme Bancalari
Tracks
Tracks renewal Santa Fe
Signal and telecom
Adequacy telegraph line Korn - Mar del Plata
Province
Budget (Million USD)
Tender
Source of funding
Buenos Aires
23
may-17
Treasury
Santa Fe
14
may-17
CMEC
Buenos Aires
4
may-17
Treasury
Many
478
jun-17
CMEC
Tracks
Tracks renewal stage III Belgrano Cargas
Tracks
Tracks renewal Congreso - Tigre
Buenos Aires
32
jun-17
Treasury
New station Retiro
Buenos Aires
30
jun-17
Treasury
Tracks
Trancks renewal Glew - Alejandro Korn
Buenos Aires
10
jun-17
Treasury
Tracks
Railway crossing Mitre line
Buenos Aires
4
jun-17
Treasury
Station Castelar - Central Walk
Buenos Aires
2
jun-17
Treasury
Signal and telecom Once station
Buenos Aires
73
jul-17
Treasury
Many
13
jul-17
Treasury
Civil Works
Civil Works Signal and telecom Civil Works
Workshop San Martín line
Civil Works
Adequacy José C. Paz station - línea Mitre
Buenos Aires
6
jul-17
Treasury
Civil Works
Renovation Morón station - Sarmiento line
Buenos Aires
5
jul-17
Treasury
RAILWAYS
26 future tenders 2017: 891 M USD Contact: Guillermo Fiad (Presidente, ADIF)
[email protected]
Category Civil Works Tracks Civil Works
Description Rehabilitation bridge Belgrano Cargas Tracks renewal Caroya section Low level crossing - Belgrano Sur line
Province
Budget (Million USD)
Tender
Source of funding
Many
4
jul-17
CAF
Córdoba
10
ago-17
Treasury
Buenos Aires
29
sep-17
Treasury
Santa Fe
23
sep-17
Treasury
Tracks
Tracks renewal Fournier section
Tracks
Integral adequacy Mar del Plata section
Buenos Aires
18
sep-17
Treasury
Change leads 815 Etapa II
Buenos Aires
13
sep-17
Treasury
Buenos Aires
2
sep-17
Treasury
Many
33
oct-17
Treasury
Tucumán
5
oct-17
Treasury
Electrification
Signal and telecom Tracks renewal Maldona - J. L Suárez Tracks
Tracks renewal Rufino - Bouchardo
Tracks
Tracks renewalTapia - Los Mogotes branch C Belgrano Cargas line
Tracks
Tracks expansion station Lavallol - Belgrano Cargas line
Buenos Aires
1
oct-17
CMEC
Tracks
Tracks renewal Tapiales - González Catán - Belgrano Sur line
Buenos Aires
15
nov-17
Treasury
Substitution swichtes 20 kv for 9 subestations
Buenos Aires
7
dic-17
Treasury
Many
7
ene-18
Treasury
Córdoba
30
feb-18
Treasury
Electrification Civil Works Tracks
Improvements in service station : Concordia, Timbues, San Cristobal, Monte Caseros, Guemes, Paso de los Libres, Garupá y Zarate Tracks renewal Bouchardo - Huinca Renanco
TOTAL
USD 891 M
PORTS 6 future tender: USD 109 M + USD 2,000 M
Contact: Manuela López Menéndez
[email protected]
Description
Province
Budget (Million USD)
Tender
Source of funding
Concession Buenos Aires port
Buenos Aires City
2,000
TBC
PPP
Structure adaptation and access to the port
Entre Rios
1
jun-17
Treasury
Structure adaptation and access to the Quequen port
Buenos Aires
30
jul-17
Treasury
Construction of breakswaters to the Mar del Plata port
Buenos Aires
13
ago-17
Treasury
Construction of spring to the Bahía Blanca port
Buenos Aires
15
ago-17
Treasury
Adequacy spirng to La Plata port
Buenos Aires
50
dic-17
Treasury
TOTAL
USD 109 M + USD 2,000 M
AIRPORTS 62 future tenders 2017: 750 M USD
Contact: Patricio Di Stéfano (Presidente, ORSNA)
[email protected] Airports Catamarca
Description Approximation light system (SALS)
Comodoro Rivadavia Renovation on runway and platform
Province
Budget (Million USD)
Tender
Source of funding
Catamarca
0,6
May-17
Direct Investments / trust
Chubut
9,3
May-17
Direct Investments / trust
Ezeiza
Electric repowering
Buenos Aires
1,3
May-17
Direct Investments / trust
Ezeiza
Resurfacing runway
Buenos Aires
9,4
May-17
Direct Investments / trust
Aeroparque
New post PAMPA - CHARLIE
Buenos Aires
1,2
May-17
Direct Investments / trust
Aeroparque
Energy and beacon system
Buenos Aires
1,6
May-17
Direct Investments / trust
Aeroparque
EDIFICIO VI - Upper floor renovation
Buenos Aires
0,6
May-17
Direct Investments / trust
New camara parking system
Buenos Aires
0,4
May-17
Direct Investments / trust
Aeroparque
EDIFICIO VII Y VIII - New passenger terminal (lower levels) - Equipment
Buenos Aires
9,3
May-17
Direct Investments / trust
Aeroparque
New commercial platform (North)
Buenos Aires
12,5
May-17
Direct Investments / trust
Bariloche
Health Area - National arrivals hall
Río Negro
0,3
May-17
Direct Investments / trust
Buenos Aires
1
May-17
Direct Investments / trust
Ezeiza
Ezeiza
Replacing the BRITE system with AGLAS
Río Grande
Renovations on runway
Tierra del Fuego
3,7
May-17
Direct Investments / trust
Catamarca
New passenger terminal
Catamarca
12,5
Jun-17
Direct Investments / trust
Chubut
3,1
Jun-17
Direct Investments / trust
Córdoba
1,5
Jun-17
Direct Investments / trust
Comodoro Rivadavia New beacon system (include UPS) Córdoba
Expansion of existing parking
AIRPORTS 62 future tenders 2017: 750 M USD
Contact: Patricio Di Stéfano (Presidente, ORSNA)
[email protected] Felisa Blaquier (Comunicaciones, ORSNA)
[email protected] Airports
Description
Province
Budget (Million USD)
Tender
Source of funding
Chubut
7,5
Jun-17
Direct Investments / trust
Esquel
Passennger terminal remodelations
Ezeiza
Beacon provition for taxiway
Buenos Aires
1,8
Jun-17
Direct Investments / trust
Ezeiza
Updating beacon system on movement area
Buenos Aires
9,3
Jun-17
Direct Investments / trust
Ezeiza
New medium voltage camara CHIVATOS
Buenos Aires
0,09
Jun-17
Direct Investments / trust
New beacon system CAT I - high intensity - turning basin, corrective work and demarcation
Formosa
3,1
Jun-17
Direct Investments / trust
Resurfacing runway
Misiones
9,3
Jun-17
Direct Investments / trust
Formosa
Iguazú Jujuy
Parking
Jujuy
3,1
Jun-17
Direct Investments / trust
Jujuy
Expansion of commercial platform
Jujuy
2,8
Jun-17
Direct Investments / trust
San Fernando
tubing of rainwater
Buenos Aires
0,02
Jun-17
Direct Investments / trust
San Fernando
New control tower
Buenos Aires
2,5
Jun-17
Direct Investments / trust
Renovations on runway and beacon system
San Juan
7,5
Jun-17
Direct Investments / trust
Approximation light system (SALS)
Mendoza
0,06
Jun-17
Direct Investments / trust
Tucumán
New terminal - TWR -Parking - Accesses
Tucumán
45
Jun-17
Direct Investments / trust
Tucumán
Expansion of commercial platform
Tucumán
5
Jun-17
Direct Investments / trust
Tucumán
ALS system (900 MTS)
Tucumán
1,2
Jun-17
Direct Investments / trust
Ezeiza
New hall B - EDIFICIO -
Buenos Aires
156
Jul-17
Direct Investments / trust
San Juan San Rafael
AIRPORTS 62 future tenders 2017: 750 M USD
Contact: Patricio Di Stéfano (Presidente, ORSNA)
[email protected] Felisa Blaquier (Comunicaciones, ORSNA)
[email protected] Airports
Description
Province
Budget (Million USD)
Tender
Source of funding
Ezeiza
New parking and outdoor spaces
Buenos Aires
25
Jul-17
Direct Investments / trust
Ezeiza
Renovation and lighting platform post Zulu (EX CAB. 05)
Buenos Aires
3,1
Jul-17
Direct Investments / trust
Ezeiza
Readjustment of lighting platform FBO Y Chivatos
Buenos Aires
0,07
Jul-17
Direct Investments / trust
Jujuy
New passenger terminal
Jujuy
28,1
Jul-17
Direct Investments / trust
Río Grande
New atmospheric discharges installation
Tierra del Fuego
0,02
Jul-17
Direct Investments / trust
San Juan
Expansion of commercial platform
San Juan
5
Jul-17
Direct Investments / trust
Comodoro Rivadavia
New passenger terminal - equipment
Chubut
4,6
Ago-17
Direct Investments / trust
Córdoba
Airport entrance station
Córdoba
2,5
Ago-17
Direct Investments / trust
Ezeiza
Renovation in pre-shipment area - Terminal A - Stage 2
Buenos Aires
5
Ago-17
Direct Investments / trust
Ezeiza
New passenger terminal - Ex estuche -
Buenos Aires
187,5
Ago-17
Direct Investments / trust
Ezeiza
Parking post signs in platform
Buenos Aires
0,03
Ago-17
Direct Investments / trust
Formosa
New passenger terminal
Formosa
12,5
Ago-17
Direct Investments / trust
Jujuy
New control tower
Jujuy
3,1
Ago-17
Direct Investments / trust
La Rioja
New passenger terminal
La Rioja
9,3
Ago-17
Direct Investments / trust
AIRPORTS 62 future tenders 2017: 750 M USD
Contact: Patricio Di Stéfano (Presidente, ORSNA)
[email protected] Felisa Blaquier (Comunicaciones, ORSNA)
[email protected] Airports
Description
Province
La Rioja
New beacon system category I- high intensity
La Rioja
Budget (Million USD) 2,8
Malargüe
Main renovation on terminal
Mendoza
Malargüe
Fissures repairing on runway 14-32 and taxiway
Mendoza
New water supply - southern area
San Juan San Juan Ezeiza
Tender
Source of funding
Ago-17
Direct Investments / trust
1,8
Ago-17
Direct Investments / trust
Mendoza
1,1
Ago-17
Direct Investments / trust
Mendoza
65,5
Ago-17
Direct Investments / trust
New passenger terminal
San Juan
23,7
Ago-17
Direct Investments / trust
New parking
San Juan
3,1
Ago-17
Direct Investments / trust
Renovation on arrivals area - Terminal A
Buenos Aires
9,3
Sept-17
Direct Investments / trust
Ezeiza
Renovation on runway 11-29
Buenos Aires
12,5
Sept-17
Direct Investments / trust
Ezeiza
New hall B - baggage system
Buenos Aires
8,3
Sept-17
Direct Investments / trust
Ezeiza
Buenos Aires
21,8
Sept-17
Direct Investments / trust
Misiones
12,5
Sept-17
Direct Investments / trust
Santa Rosa
Taxiway to header 35 Renovation on passenger terminal + telescoping walkway provision Frame, perimeter wall and perimeter fence
La Pampa
0,02
Sept-17
Direct Investments / trust
Posadas
Ezeiza
Resurfacing taxiway alfa, center line complete
Buenos Aires
2,1
Oct-17
Direct Investments / trust
Río Grande
Approximation light system (SALS)
Tierra del Fuego
1,3
Oct-17
Direct Investments / trust
Ezeiza
Leading electrical substation (P49) / medium voltage feeders
Buenos Aires
2
Nov-17
Direct Investments / trust
Iguazú
Parking
Misiones
3,1
Nov-17
Direct Investments / trust
TOTAL
USD 750 M
URBAN MOBILITY 12 future tenders 2017-2019: 5,798 M USD
Contact: Manuela López Menéndez (Secretaria de trabajos de transporte público)
[email protected] Category
Description
Province
Budget (Million USD)
Tender
Source of funding
Electrification
Electrification San Martín line
Metropolitan Area of Buenos Aires
520
jun-17
Treasury
Signal and telecom
Signallling Roca line
Metropolitan Area of Buenos Aires
170
jun-17
BID
Tracks
Track renewal Roca line
Metropolitan Area of Buenos Aires
50
may-17
BID
Signal and telecom
Adequacy comunication Roca line
Metropolitan Area of Buenos Aires
200
jul-17
BID
RER
Construction Constitución station
Metropolitan Area of Buenos Aires
283
may-17
Treasury
RER
Construction Obelisco station
Metropolitan Area of Buenos Aires
877
jun-17
Treasury
Additional works
Adequacy work of Roca line
Metropolitan Area of Buenos Aires
25
ago-17
Treasury
RER
Interchanges
Metropolitan Area of Buenos Aires
385
2017
Treasury
RER
Construcción Correo Central Station
Metropolitan Area of Buenos Aires
485
2018
Treasury
RER
Connection Sarmiento line
Metropolitan Area of Buenos Aires
438
2018
Treasury
RER
Overpass San Martín line
Metropolitan Area of Buenos Aires
62
2018
Treasury
RER
Electrification Belgrano Sur line, Belgrano Norte line and Mitre line
Metropolitan Area of Buenos Aires
1,865
2018-2019
Treasury
TOTAL
USD 5,798 M