Conduction Line from RP2 to storage tank

8 ene. 2007 - Design details. Position (m) Length (m) Description. Automatic valve locations (m). Manual purge valve locations. (m). 0. 704. 2" SDR 32.5. 704.
26KB Größe 10 Downloads 111 vistas
Air in Water Pipes Design Report Project: Designer: Design ID: Notes

Mongallo / Negrowas Tomas Matamoros Caja Rompe Presio #2 a Tanque Propuesto

Date:

8-Abr-2010 10:38

XLS Version DLL Version

5.9 Revised 8 January 2007 1.07

Minimum flow Maximum flow Ha L Average Slope Ht

2.00 l/s 2.00 l/s 107.312965393066 m 5887.77978515625 m 1.8% 21.8 m This is a case A1

Total Cost:

C$ 200,749

Design sumary Cost

1028 837 3007 1016

m 1.5" SDR 32.5 m 2" SDR 32.5 m 2" SDR 26 m 2" SDR 17

C$ 19,182 C$ 23,859 C$ 104,508 C$ 53,199

0

1000

2000

3000

4000

5000

6000

7000

0

-50

-100

-150

-200

-250

-300 Profile

HGL

Valves

SDR 32.5 Max

SDR 26 Max

SDR 17 Max

Purge valves

Design details

Position (m) 0 704 989 1013 1085 1234 1573 1815 1852 2125 2630 2683 2949 3089 3176 3374 3379 3506 3704 3780 3983 4116 4340 4420 4497 4541 4554 4727 4860

Length (m) 704 285 24 72 149 339 242 37 273 506 53 266 140 87 198 5 127 198 76 203 133 224 80 77 44 13 173 133 20

Description 2" SDR 32.5 2" SDR 26 2" SDR 17 2" SDR 26 2" SDR 26 2" SDR 17 2" SDR 17 2" SDR 26 2" SDR 26 2" SDR 26 2" SDR 26 2" SDR 17 2" SDR 17 2" SDR 26 2" SDR 26 2" SDR 17 2" SDR 26 2" SDR 26 2" SDR 26 2" SDR 26 2" SDR 26 2" SDR 26 2" SDR 26 2" SDR 26 2" SDR 26 2" SDR 26 2" SDR 26 2" SDR 32.5 1.5" SDR 32.5

Automatic Manual purge valve valve locations locations (m) (m)

4880 5164 5503 5583

283 340 80 305

1.5" SDR 32.5 1.5" SDR 32.5 1.5" SDR 32.5 1.5" SDR 32.5